Defense contracts, matched to stocks.
Every Department of War award since 2024, linked to its source.
| LMT | Lockheed Martin Corp. | $10.3M | |
| LMT | Sikorsky Aircraft Corp. | $22.0M | |
| AMTM | Amentum Service Inc. | $609.0M | |
| BA | The Boeing Co. | $119.7M | |
| LMT | The Lockheed Martin Corp., Rotary and Mission Systems | $122.4M | |
| NOC | Northrop Grumman Systems Corp. | $25.4Mmaximum | |
| BA | The Boeing Co. | $16.9M |
Coverage
680 daily announcements from 2024-01-02 to 2026-11-06, each award of $7.5M or more matched to the public company that won it. Figures below cover the last 12 months (since 2025-11-06). Definite = stated award amounts. Potential = ceilings and IDIQ maximums the government may never fully use. Shared pools and flagged records are not counted. How counting works. Backlog is each company's latest remaining performance obligations from its SEC filings. Parts makers such as TransDigm and Howmet sell mostly through other contractors, so they rarely appear in the announcements at all.
| Company | Definite | Potential | Awards | Latest award | Backlog |
|---|---|---|---|---|---|
| LMT Lockheed Martin Corp. | $44.95B | $18.26B | 223 | 2026-11-06 | $292.00B |
| RTX RTX Corp. | $36.14B | $18.60B | 143 | 2026-10-30 | $340.00B |
| NOC Northrop Grumman Corp. | $8.45B | $9.90B | 98 | 2026-11-03 | $109.60B |
| GD General Dynamics Corp. | $11.43B | $542.1M | 83 | 2026-11-02 | $118.00B |
| LHX L3Harris Technologies Inc. | $3.44B | $2.61B | 47 | 2026-10-13 | $42.00B |
| BA The Boeing Co. | $37.93B | $150.51B | 107 | 2026-11-04 | $745.43B |
| HII Huntington Ingalls Industries Inc. | $7.37B | $417.7M | 42 | 2026-10-23 | $86.20B |
| GE GE Aerospace | $5.05B | $891.5M | 40 | 2026-10-01 | $212.08B |
| TDG TransDigm Group Inc. | none | none | 0 | 2025-03-17 | not reported |
| HWM Howmet Aerospace Inc. | none | none | 0 | none since 2024 | not reported |
| KTOS Kratos Defense & Security Solutions Inc. | none | $24.1M | 2 | 2026-06-15 | $2.65B |
Latest awards to tracked companies
| Date | Ticker | Recipient | Amount | % of RPO / revenue | Details |
|---|---|---|---|---|---|
| LMT | Lockheed Martin Corp.Navy | $10.3M | <0.01% of RPO0.01% of rev. |
Lockheed Martin Corp., Syracuse, New York, is awarded a $10,309,201 cost-plus-incentive-fee modification to previously awarded delivery order (N0002425F6260) under……indefinite-delivery/indefinite quantity contract (N0002425D6211) for engineering support related to submarine electronic warfare systems on new construction and in-service submarines. Work will be performed in Syracuse, New York, and is expected to be completed by February 2027. Fiscal 2027 other procurement (Navy) funds in the amount of $5,200,000 (50%); fiscal 2027 research, development, test and evaluation (Navy) funds in the amount of $4,017,201 (39%); and fiscal 2027 shipbuilding and conversion (Navy) funds in the amount of $1,092,000 (11%), will be obligated at time of award and will not expire at the end of the current fiscal year. Naval Sea Systems Command, Washington, D.C., is the contracting activity. Official page Archived copy LMT prices around this date (Yahoo) |
|
| LMT | Sikorsky Aircraft Corp.Army | $22.0M | <0.01% of RPO0.03% of rev. |
Sikorsky Aircraft Corp., Stratford, Connecticut, was awarded a $22,036,976 modification (P00016) to contract W911W6-21-D-0001 for specialized engineering analysis test……and technical services, UH-60 modernization, and strategic planning support. The amount of this action is $22,036,976 with a total cumulative face value of $70,130,735. One bid was solicited with one received. Work locations and funding will be determined with each order, with an estimated completion date of March 15, 2027. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. Official page Archived copy LMT prices around this date (Yahoo) |
|
| AMTM | Amentum Service Inc.Army | $609.0M |
Amentum Service Inc., Chantilly, Virginia, was awarded a $608,999,219 firm-fixed-price contract for supplemental workforce of at least 500 full-time equivalent personnel……to sustain Department of War organic industrial base operations across key depots. Bids were solicited via the internet with one received. Work will be performed in Texarkana, Texas, with an estimated completion date of Nov. 12, 2031. Fiscal 2027 consolidated working fund, Army, engineers, civil funds in the amount of $121,946,770 were obligated at the time of the award. Army Contracting Command, Detroit Arsenal, Michigan, is the contracting activity (W911RQ-27-C-A004). Official page Archived copy AMTM prices around this date (Yahoo) |
||
| BA | The Boeing Co.Navy | $119.7M | 0.02% of RPO0.13% of rev. |
The Boeing Co., Seattle, Washington, is awarded a $119,654,234 cost-plus-fixed-fee modification (P00001) to a previously issued order (N0001926F1095) against a basic……ordering agreement (N0001926G1002). This modification exercises options to procure nine retrofit A-kits, seven for Navy P-8A Poseidon aircraft and two for Royal Australian Air Force P-8A aircraft, incorporating Increment Three Block Two engineering change Proposal Six capabilities. The modification also provides for the installation of four retrofit A-kits and associated government-furnished B-kits on Navy P-8A aircraft. Work will be performed in Jacksonville, Florida (79.6%); St. Louis, Missouri (10.9%); and Mesa, Arizona (9.5%), and is expected to be completed in May 2030. Fiscal 2027 aircraft procurement (Navy) funds in the amount of $110,156,192 and Royal Australian Air Force cooperative partner funds in the amount of $9,498,042 will be obligated at the time of award. This modification was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy BA prices around this date (Yahoo) |
|
| LMT | The Lockheed Martin Corp., Rotary and Mission SystemsNavy | $122.4M | 0.04% of RPO0.16% of rev. |
The Lockheed Martin Corp., Rotary and Mission Systems, Mitchel Field, New York, is awarded a $122,449,494 cost-plus-incentive-fee and cost-plus-fixed-fee contract……(N0003027C3015) to provide Strategic Weapon System Trident Fleet Support, Trident II SSP Shipboard Integration Increment 8, Navigation Subsystem development efforts. This contract award also benefits a foreign military sale to the United Kingdom. This value includes optional line items, if exercised. Work will be performed in Mitchel Field, New York (77%); Huntington Beach, California (20%); Manassas, Virginia (2%); and various other locations (less than 1% each, 1% total). Work is expected to be completed by Oct. 31, 2030. This action is awarded subject to the availability of funds in accordance with Revolutionary Federal Acquisition Regulation Overhaul 52.232-18. Fiscal 2027 operations and maintenance, Navy funds in the amount of $3,967,324; fiscal 2027 other procurement, Navy funds in the amount of $12,257,072; and fiscal 2027 shipbuilding and conversion, Navy funds in the amount of $12,966,189, will be obligated on this award. Fiscal 2027 operations and maintenance, Navy funds will expire at the end of the current fiscal year. This contract is being awarded as a sole-source pursuant to 10 U.S. Code 3204(a)(1) and (4). Portfolio Acquisition Executive Strategic Systems Programs, Washington, D.C., is the contracting activity. Official page Archived copy LMT prices around this date (Yahoo) |
|
| NOC | Northrop Grumman Systems Corp.Defense Logistics Agency | $25.4M maximum |
Northrop Grumman Systems Corp., Sunnyvale, California, has been awarded a maximum $25,406,155 firm-fixed-price, definite-quantity delivery order (SPE4AX-27-F-0542)……against a five-year basic ordering agreement (SPE4A1-22-G-0004) for flow control valves. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.103-1. This is a three-year contract with no option periods. The delivery order end date is Dec. 18, 2029. Using military service is Navy. Type of appropriation is fiscal 2027 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. Official page Archived copy NOC prices around this date (Yahoo) |
||
| BA | The Boeing Co.Air Force | $16.9M | <0.01% of RPO0.02% of rev. |
The Boeing Co., Oklahoma City, Oklahoma, has been awarded a $16,910,812 modification (P00009) to previously awarded contract FA2363-25-C-B002 for Japan E-767 Airborne……Warning and Control System post-delivery support services. This modification provides for the exercise of an option period for the continuation of technical sustainment, engineering, on-site field service representatives, and software maintenance services. The modification does not change the total cumulative face value of the contract of $35,530,249. Work will be performed in Oklahoma City, Oklahoma; San Antonio, Texas; and Hamamatsu Air Base, Japan, and is expected to be completed by Nov. 14, 2027. This contract involves Foreign Military Sales (FMS) to Japan. FMS funds in the amount of $16,910,812 are being obligated at the time of award. The Air Force Life Cycle Management Center, Hanscom Air Force Base, Massachusetts, is the contracting activity. (Awarded on Nov. 2, 2026). Official page Archived copy BA prices around this date (Yahoo) |
|
| LMT | Lockheed Martin Corp.Air Force | $80.0M maximum |
Lockheed Martin Corp., Manassas, Virginia, has been awarded a maximum $80,000,000 time-and-materials task order under the General Services Administration Alliant 2……governmentwide acquisition contract for Strategic Mission Planning and Execution System Global Strike Product Support (SMPES GSPS). This task order provides agile software engineering, modernization, continuous maintenance, sustainment, and architectural updates for the operational SMPES GSPS applications suite. Work will be performed at Offutt Air Force Base, Nebraska, and is expected to be completed by Jan. 19, 2030. This task order was a competitive acquisition, and one offer was received. Fiscal 2027 operations and maintenance funds in the amount of $868,270; and fiscal 2027 research, development, test and evaluation funds in the amount of $500,000, are being obligated at the time of award. The Air Force Nuclear Weapons Center, Offutt AFB, Nebraska, is the contracting activity (FA2217-27-F-B001). Official page Archived copy LMT prices around this date (Yahoo) |
||
| GD | General Dynamics Electric Boat Corp.Navy | $14.5M | 0.01% of RPO0.03% of rev. |
General Dynamics Electric Boat Corp., Groton, Connecticut, is awarded a $14,513,267 undefinitized contract action under a previously awarded contract (N00024-12-C-2115)……in support of the USS Idaho (SSN 799) Post Delivery Work Period. Work will be performed in Groton, Connecticut, and is expected to be completed by December 2027. Fiscal 2026 shipbuilding and conversion (Navy) $10,884,950 will be obligated at the time of award and will not expire at the end of the current fiscal year. Supervisor of Shipbuilding Conversion and Repair, Groton, Connecticut, is the contracting activity. Official page Archived copy GD prices around this date (Yahoo) |
|
| CAE | CAE USA Inc.Air Force | $14.8M |
CAE USA Inc., Arlington, Texas, has been awarded a $14,800,647 hybrid firm-fixed-price contract for Taiwan Air Force F-16 Block 20V and Block 70 Mission Training Center……Program contractor logistics support (CLS)-futures. This contract provides CLS, spares management, travel, data, and dislocation. Work will be performed outside the continental U.S.; Chiayi, Hualien, and Taitung, Taiwan; and within the continental U.S., at Morris Air National Guard Base, Tucson, Arizona, and is expected to be completed by Jan. 30, 2032. This contract involves Foreign Military Sales (FMS) to Taiwan. This contract was a sole-source acquisition. FMS funds in the amount of $2,234,180 are being obligated at the time of award. The Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8621-27-C-B001). (Awarded on Oct. 28, 2026). Official page Archived copy CAE prices around this date (Yahoo) |
||
| RTX | Pratt & WhitneyAir Force | $25.2M ceiling |
Pratt & Whitney, Hartford, Connecticut, has been awarded a $25,193,724 ceiling cost-plus-fixed-fee contract for the component improvement program for secondary power……systems and small gas turbine engines. This contract provides for engineering services and research and development to improve the safety, reliability, and maintainability of parts used to start main engines. Work will be performed in West Palm Beach, Florida, and is expected to be completed by Oct. 27, 2036. This contract was a sole-source acquisition. No funds are being obligated at the time of award; fiscal 2026 research, development, test and evaluation funds will be incrementally obligated over the next 10 years. The Air Force Sustainment Center, Hill Air Force Base, Utah, is the contracting activity (FA8252-27-D-B001). (Awarded on Oct. 28, 2026). Official page Archived copy RTX prices around this date (Yahoo) |
||
| VVX | V2X Systems LLCArmy | $104.6M |
V2X Systems LLC, Colorado Springs, Colorado, was awarded a $104,641,327 modification (P00080) to contract W91RUS-21-C-0001 for operation, maintenance and defense of Army……communications supporting Army operational base communications information systems and infrastructure. The modification brings the total cumulative face value of the contract to $813,128,030. Work will be performed in Kuwait, Jordan, Bahrain, and Qatar, with an estimated completion date of Oct. 31, 2028. Fiscal 2027 operations and maintenance, Army funds in the amount of $16,164,488 were obligated at the time of the award. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity (W91RUS-21-C-0001). Official page Archived copy VVX prices around this date (Yahoo) |
||
| LMT | Lockheed Martin Corp.Air Force | $95.0M | 0.03% of RPO0.13% of rev. |
Lockheed Martin Corp., Littleton, Colorado, has been awarded a $95,000,000 modification (P00208) to previously awarded contract FA8807-18-C-0009 for fully funding the……Zero Buy request for equitable adjustment. The modification brings the total cumulative face value of the contract to $4,728,023,341 from $4,633,023,341. Work will be performed at Littleton, Colorado, and is expected to be completed by Oct. 27, 2026. Fiscal 2025 and 2026 procurement funds in the amount of $95,000,000 are being obligated at the time of award. The Space Force Portfolio Acquisition Executive for Satellite Communications and Positioning, Navigation, and Timing, Los Angeles Air Force Base, California, is the contracting activity. Official page Archived copy LMT prices around this date (Yahoo) |
|
| LMT | Lockheed Martin, Mission Systems and TrainingNavy | $13.4M | <0.01% of RPO0.02% of rev. |
Lockheed Martin, Mission Systems and Training, Baltimore, Maryland, is awarded a $13,444,766 cost-plus-award-fee order (N6278626F1000) against the previously awarded……basic ordering agreement (N00024-19-G-2319) to provide engineering and management services for USS Cleveland (LCS 31) post shakedown availability. Work will be performed in Pascagoula, Mississippi (60%); and Mayport, Florida (40%), and is expected to be completed by August 2027. Fiscal 2026 shipbuilding and conversion (Navy) funding in the amount of $13,444,766 will be obligated at time of award and will not expire at the end of the current fiscal year. The Supervisor of Shipbuilding, Conversion, and Repair, Bath, Maine, is the contracting activity. Official page Archived copy LMT prices around this date (Yahoo) |
|
| BA | The Boeing Co.Navy | $23.8M | <0.01% of RPO0.03% of rev. |
The Boeing Co., St. Louis, Missouri, is awarded a $23,805,339 firm-fixed-price modification (P00004) to previously issued delivery order (N0001925F0280) against basic……ordering agreement (N0001921G0006). This modification exercises options to procure 64 Distributed Targeting Processor-Networked (DTP-N) A-Kits and 32 DTP-N B-Kits, as well as provides associated cybersecurity and obsolescence support in connection with F/A-18 aircraft service life modifications for the Navy. Work will be performed in Melbourne, Florida (60%); and St. Louis, Missouri (40%), and is expected to be completed in January 2028. Fiscal 2027 aircraft procurement (Navy) funds in the amount of $23,805,339 will be obligated at the time of award. This modification was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy BA prices around this date (Yahoo) |
|
| TXT | Bell Textron Inc.Navy | $114.7M |
Bell Textron Inc., Fort Worth, Texas, is awarded a $114,692,840 fixed-price-incentive, firm-fixed-price, and cost-plus-fixed-fee modification (P00001) to a previously……awarded contract (N0001926C0140). This modification exercises an option for the H-1 structural and power improvements for Next-Gen Effects Phase III effort to procure 15 A-kits, four mission kits, nine aircraft installations, long-lead and time-critical components, associated materials and labor, and spares in support of electrical power upgrades and structural improvements to the Marine Corps AH-1Z and UH-1Y helicopters. Work will be performed in Fort Worth, Texas (38.1%); Amarillo, Texas (28.7%); Tempe, Arizona (6.3%); Grand Rapids, Michigan (4.5%); Stilwell, Oklahoma (2.6%); Anaheim, California (2.2%); Phoenix, Arizona (1.5%); Lebanon, New Hampshire (1.5%); Crestview, Florida (1.4%); Chicago, Illinois (1.1%); various locations within the continental U.S. (11%); and various locations outside the continental U.S. (1.1%), and is expected to be completed in June 2028. Fiscal 2027 aircraft procurement (Navy) funds in the amount of $114,692,840 will be obligated at the time of award. This modification was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy TXT prices around this date (Yahoo) |
||
| LMT | Lockheed Martin Corp.Army | $10.4M | <0.01% of RPO0.01% of rev. |
Lockheed Martin Corp., Grand Prairie, Texas, was awarded a $10,439,315 cost-plus-incentive-fee contract to provide Phased Array Tracking to Intercept of Target (PATRIOT)……Advanced Capability-3 guidance processor unit redesign, Seeker Block V flight test support. One bid was solicited with one received. Work will be performed in Grand Prairie, Texas, with an estimated completion date of Nov. 30, 2027. Fiscal 2027 missile procurement, Army funds in the amount of $10,439,315 were obligated at the time of the award. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W31P4Q-27-F-A004). Official page Archived copy LMT prices around this date (Yahoo) |
|
| AMTM | Amentum Services Inc.Air Force | $27.3M |
Amentum Services Inc., Chantilly, Virginia, has been awarded a $27,301,761 modification (P00056) to previously awarded contract FA4890-22-C-0015 for Pacific Air Forces……global prepositioned materiel services. This modification provides for the funding of option year five services to provide storage, maintenance, outload, reconstitution, exercise, and contingency logistics support of prepositioned materiel. The modification brings the total cumulative face value of the contract to $177,443,754 from $150,141,992. Work will be performed at Joint Base Elmendorf-Richardson, Alaska; Holloman Air Force Base, New Mexico; Andersen AFB, Guam; and Misawa Air Base, Japan, and is expected to be completed by Oct. 31, 2027. Fiscal 2027 operation and maintenance funds in the amount of $27,301,761 are being obligated at the time of award. The Air Combat Command, Acquisition Management and Integration Center, Langley Air Force Base, Virginia, is the contracting activity. (Awarded on Oct. 28, 2026). Official page Archived copy AMTM prices around this date (Yahoo) |
||
| BA | The Boeing Co.Air Force | $31.9M maximum |
The Boeing Co., St. Louis, Missouri, has been awarded a maximum $31,911,362 firm-fixed-price and cost-reimbursement contract for the NATO Airlift Management Programme……(NAMP) C-17 customer logistics service. This contract provides three years of customer logistics support for the NAMP C-17 weapon system trainer. Work will be performed at Papa Air Base, Hungary, and is expected to be completed by Oct. 31, 2029. This contract involves Foreign Military Sales (FMS) to NATO. FMS funds in the amount of $23,348,054 are being obligated at the time of award. The Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8621-27-C-B002). Official page Archived copy BA prices around this date (Yahoo) |
||
| RTX | RTX Corp., Pratt & Whitney Military EnginesNavy | $32.2M | <0.01% of RPO0.04% of rev. |
RTX Corp., Pratt & Whitney Military Engines, East Hartford, Connecticut, is awarded a $32,181,162 cost-plus-incentive-fee modification (P00009) to a previously awarded……contract (N0001926C0112). This modification exercises an option to provide recurring sustainment support to include repair of repairables support for the F135 propulsion systems used in the F-35A conventional takeoff and landing and F-35C carrier variant aircraft in support of the F-35 Lightning II program in support of the Air Force, Navy, Marine Corps, F-35 cooperative program partners, and Foreign Military Sales (FMS) customers. Work will be performed in East Hartford, Connecticut (40%); Oklahoma City, Oklahoma (21%); Indianapolis, Indiana (12%); West Palm Beach, Florida (6%); Windsor Locks, Connecticut (6%); Brekstad, Norway (4%); Leeuwarden, Netherlands (3%); Iwakuni, Japan (3%); Williamtown, Australia (2%); Cameri, Italy (1%); Marham, United Kingdom (1%); and Fort Worth, Texas (1%), and is expected to be completed in November 2027. Fiscal 2027 operations and maintenance (Air Force) funds in the amount of $16,453,791; fiscal 2027 operations and maintenance (Navy) funds in the amount of $4,164,560; fiscal 2027 operations and maintenance (Marine Corps) funds in the amount of $1,612,425; F-35 cooperative program partner funds in the amount of $5,738,624; and FMS customer funds in the amount of $4,211,762 will be obligated at the time of award. This modification was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy RTX prices around this date (Yahoo) |
|
| NOC | Northrop Grumman Systems Corp.Navy | $56.0M | 0.05% of RPO0.13% of rev. |
Northrop Grumman Systems Corp., San Diego, California, was awarded a $55,986,538 firm-fixed-price modification (P00003) to a previously awarded delivery order……(N0001926F1093) under basic ordering agreement (N0001925G0003) for installation of the B7 Retrofit Material Kit on an MQ-4C Triton air vehicle. Work will be performed in Palmdale, California (64%); San Diego, California (34%); and various locations within the continental U.S. (2%), and is expected to be completed in May 2030. Fiscal 2027 aircraft procurement (Navy) funds in the amount of $55,986,538 will be obligated at the time of award. This contract modification was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland is the contracting activity. (Awarded Oct. 28, 2026). Official page Archived copy NOC prices around this date (Yahoo) |
|
| BA | The Boeing Co.Navy | $11.1M | <0.01% of RPO0.01% of rev. |
The Boeing Co., St. Louis, Missouri (N6134023C0004), is awarded an $11,144,746 firm-fixed-price, cost-plus-fixed-fee modification (P00012) to a previously awarded……contract for F/A-18 instructor-pilot and ground-training-specialist services, including associated in-country and program support, for the Kuwait Air Force. Work will be performed at Ahmad al-Jaber Air Base, Kuwait, and is expected to be completed in October 2027. Foreign Military Sales customer funds in the amount of $11,144,746 will be obligated at the time of award. This contract modification was not competitively procured. Naval Air Warfare Center Training Systems Division, Orlando, Florida, is the contracting activity. Official page Archived copy BA prices around this date (Yahoo) |
|
| LMT | Lockheed Martin Aeronautics Co.Navy | $43.7M | 0.01% of RPO0.06% of rev. |
Lockheed Martin Aeronautics Co., Fort Worth, Texas (N0001922C0046), is awarded a $43,673,774 cost-plus-fixed-fee modification (P00025) to a previously awarded contract.……This modification adds scope, establishing new contract line items to provide operating system upgrades to the F-35 Lightning II reprogramming laboratory facilities and systems maintained and sustained in support of the Air Force, Navy, Marine Corps, and F-35 cooperative program partners. Work will be performed in Eglin, Florida (80%); and Fort Worth, Texas (20%), and is expected to be completed in April 2030. Fiscal 2026 aircraft procurement (Air Force) funds in the amount of $6,988,754; fiscal 2026 aircraft procurement (Navy) funds in the amount of $6,988,754; and F-35 cooperative program partner funds in the amount of $29,696,266, will be obligated at the time of award. This modification was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy LMT prices around this date (Yahoo) |
|
| ACN | Accenture Federal Services LLCAir Force | $151.5M |
Accenture Federal Services LLC, Arlington, Virginia, has been awarded a $151,462,808 firm-fixed-price task order under the General Services Administration Alliant 2……government-wide acquisition contract for intercontinental ballistic missile FENCES engineering services. This task order provides for engineering, development, security, and operations of tailored FENCES, with task order ceiling of $228,000,000 to accommodate future in-scope special project requirements. Work will be performed at Hill Air Force Base, Utah, and is expected to be completed by June 30, 2030. This contract was a sole-source acquisition. Fiscal 2026 research, development, test and evaluation funds in the amount of $6,720,480 are being obligated at the time of award. The Air Force Nuclear Weapons Center, Hill AFB, Utah, is the contracting activity (FA8204-27-F-B001). (Awarded on Oct. 23, 2026). Official page Archived copy ACN prices around this date (Yahoo) |
||
| AMTM | Amentum Technology Inc.Air Force | $16.4M |
Amentum Technology Inc., Tullahoma, Tennessee, has been awarded a $16,390,078 definitive contract for System Integration Laboratory services. This contract provides……secure and reliable access for government and contractor users, cybersecurity infrastructure, and facility security support to enable designated teams to develop, test, and integrate software to support an infrastructure that connects to the North American Aerospace Defense Command (NORAD) Cheyenne Mountain Complex-Integrated Tactical Warning/Attack Assessment (NCMC-ITW/AA) Integration and Development Environment to support the NCMC-ITW/AA and the Legacy Space Command and Control Program Office. This contract ensures continued access to key systems and data necessary for the sustainment and enhancement of NORAD’s mission. Work will be performed primarily in Colorado Springs, Colorado, and is expected to be completed by Oct. 31, 2030. This contract was a sole-source acquisition. Fiscal 2027 operation and maintenance funds in the amount of $3,930,588 are being obligated at the time of award. The Space Systems Command, Peterson Space Force Base, Colorado, is the contracting activity (FA8723-27-C-B001). Official page Archived copy AMTM prices around this date (Yahoo) |
||
| BA | The Boeing Co.Army | $499.8M | 0.07% of RPO0.56% of rev. |
The Boeing Co., Mesa, Arizona, was awarded a $499,760,655 modification (P00006) to contract W58RGZ-21-D-0077 for Apache AH-64 engineering services and technical support.……Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Feb. 20, 2031. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. (Awarded Feb. 21, 2026). Official page Archived copy BA prices around this date (Yahoo) |
|
| LMT | Lockheed Martin Corp.Navy | $9.8M | <0.01% of RPO0.01% of rev. |
Lockheed Martin Corp., Owego, New York, is awarded a $9,755,583 firm-fixed-price and cost-plus-fixed-fee contract for updated AN/ALQ-230 electronic support measures and……radar warning receiver operational flight program software, and Canadian Mission Data Load Tool software, for the government of Canada’s CH-148 Cyclone helicopter fleet. The effort includes software development, documentation, testing, installation, and training to address documented software and system trouble reports. Work will be performed in Owego, New York (97%); Ottawa, Canada (1%); Halifax, Canada (1%); and Patuxent River, Maryland (1%), and is expected to be completed in October 2030. Foreign Military Sales funds in the amount of $9,755,583 will be obligated at the time of award. This contract was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N0001927C1010). Official page Archived copy LMT prices around this date (Yahoo) |
|
| LMT | Lockheed Martin Corp.Navy | $13.3M | <0.01% of RPO0.02% of rev. |
Lockheed Martin Corp., Fort Worth, Texas, is awarded a $13,259,000 cost-plus-fixed-fee, level-of-effort modification (P00006) to a previously awarded delivery order……(N0001925F0120) under a basic ordering agreement (N0001924G0010). This modification definitizes the undefinitized contract action established under the base delivery order and adds 50,000 labor hours to continue integration efforts for the F135 engine core upgrade and support the transition of the power thermal management upgrade into the preliminary design phase. The work supports the Air Force, Marine Corps, Navy, and F-35 Cooperative Program Partners. Work will be performed in Fort Worth, Texas (47%); Torrance, California (13%); El Segundo, California (6%); Blackburn, Great Britain (6%); Cheltenham, Great Britain (6%); Haltom City, Texas (4%); South Bend, Indiana (4%); Windsor Locks, Connecticut (4%); West Hartford, Connecticut (4%); Rockford, Illinois (4%); and Orlando, Florida (2%), and is expected to be completed in April 2027. No funds will be obligated at the time of award. This contract modification was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy LMT prices around this date (Yahoo) |
|
| LMT | Lockheed Martin Corp., Rotary and Mission SystemsNavy | $88.6M IDIQ ceiling |
Lockheed Martin Corp., Rotary and Mission Systems, Littleton, Colorado, was awarded an $88,560,319 cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract……for the Radiant Mercury program. This contract provides for the production, installation, program management, maintenance, modernization, and sustainment of Radiant Mercury General Service Cross Domain Solution systems. The effort also includes system security authorization support, logistics, and training services in support of Department of the Navy and other government requirements. Radiant Mercury enables the secure transfer of information across different security domains, supporting operational information-sharing requirements for the Department of Defense and other government agencies. The contract includes a three-year ordering period from Oct. 20, 2026, through Oct. 19, 2029. Specific requirements, places of performance, periods of performance, and funding will be established through individual task orders issued under the contract. The contract has a minimum ordering guarantee of $50,000 and a maximum ceiling value of $88,560,319. Individual task orders will be funded using applicable appropriations provided by the requesting government activities. This contract was not competitively procured pursuant to 10 U.S. Code 3204(a)(1), as implemented by Federal Acquisition Regulation 6.302-1, Only One Responsible Source. Naval Information Warfare Center Pacific, San Diego, California, is the contracting activity (N66001-27-D-0006). Official page Archived copy LMT prices around this date (Yahoo) |
||
| GD | General Dynamics Land Systems Inc.Army | $135.9M | 0.12% of RPO0.26% of rev. |
General Dynamics Land Systems Inc., Sterling Heights, Michigan, was awarded a $135,940,076 modification (P00005) to contract W912CH-25-D-0050 to establish the pricing……for procurement of the complete Stryker Enhanced Power Distribution Unit Version 2 Retrofit Kit. This modification brings the total cumulative face value to $162,413,191. One bid was solicited with one received. Work locations and funding will be determined with each order, with an estimated completion date of Aug. 8, 2030. Army Contracting Command, Detroit Arsenal, Michigan, is the contracting activity. Official page Archived copy GD prices around this date (Yahoo) |