NOC Northrop Grumman Corp.
Pitches on NOC: long, 2026-11-09
NOC price history on Yahoo Finance (external; Hangar doesn't show prices, why)
Totals add up the rows below; click any amount to open its source. Contract values are paid out over years and are not revenue.
Definite awards per quarter, by branch
Chart data
| Quarter | Navy | Army | Air Force | Defense Logistics Agency | Other agencies |
|---|---|---|---|---|---|
| 2024 Q1 | $211.3M | $92.1M | $150.0M | $11.1M | |
| 2024 Q2 | $914.4M | $78.0M | $634.8M | $84.8M | $12.8M |
| 2024 Q3 | $2.21B | $383.9M | $689.3M | $145.7M | $37.6M |
| 2024 Q4 | $3.76B | $1.83B | $549.9M | ||
| 2025 Q1 | $547.3M | $644.7M | $264.1M | ||
| 2025 Q2 | $465.4M | $89.1M | $40.3M | $8.0M | |
| 2025 Q3 | $631.8M | $31.9M | $550.7M | ||
| 2025 Q4 | $562.1M | $24.9M | $355.8M | $329.0M | |
| 2026 Q1 | $494.6M | $884.9M | $126.7M | ||
| 2026 Q2 | $638.7M | $356.3M | $718.7M | $475.3M | |
| 2026 Q3 | $1.71B | $186.7M | $808.1M | $63.7M | $508.5M |
| 2026 Q4 | $195.1M | $10.4M |
Backlog and revenue, from SEC filings
Backlog here is remaining performance obligations (RPO): the standard figure for contracted work not yet delivered. It is usually smaller than the "backlog" companies quote, because it leaves out unfunded orders and options. Values are as first reported; click a point or number to open the filing. How this works
Backlog ÷ revenue
RPO at fiscal year end divided by that year's revenue, both from the same 10-K. 2× means about two years of revenue is already under contract.
All values and their filings
| Figure | Period | Value | Filing | Later revision |
|---|---|---|---|---|
| RPO ÷ revenue | FY2025 (ended 2025-12-31) | 2.28× | 10-K filed 2026-01-27 | |
| RPO ÷ revenue | FY2024 (ended 2024-12-31) | 2.23× | 10-K filed 2025-01-30 | |
| RPO ÷ revenue | FY2023 (ended 2023-12-31) | 2.14× | 10-K filed 2024-01-25 | |
| RPO ÷ revenue | FY2022 (ended 2022-12-31) | 2.15× | 10-K filed 2023-01-26 | |
| RPO ÷ revenue | FY2021 (ended 2021-12-31) | 2.13× | 10-K filed 2022-01-27 | |
| RPO ÷ revenue | FY2020 (ended 2020-12-31) | 2.20× | 10-K filed 2021-01-28 | |
| RPO ÷ revenue | FY2019 (ended 2019-12-31) | 1.91× | 10-K filed 2020-01-30 | |
| Revenue Revenues | FY2025 (2025-01-01 to 2025-12-31) | $41.95B | 10-K filed 2026-01-27 | |
| Revenue Revenues | FY2024 (2024-01-01 to 2024-12-31) | $41.03B | 10-K filed 2025-01-30 | |
| Revenue Revenues | FY2023 (2023-01-01 to 2023-12-31) | $39.29B | 10-K filed 2024-01-25 | |
| Revenue Revenues | FY2022 (2022-01-01 to 2022-12-31) | $36.60B | 10-K filed 2023-01-26 | |
| Revenue Revenues | FY2021 (2021-01-01 to 2021-12-31) | $35.67B | 10-K filed 2022-01-27 | |
| Revenue Revenues | FY2020 (2020-01-01 to 2020-12-31) | $36.80B | 10-K filed 2021-01-28 | |
| Revenue Revenues | FY2019 (2019-01-01 to 2019-12-31) | $33.84B | 10-K filed 2020-01-30 | |
| RPO | at 2026-09-30 | $109.60B | 10-Q filed 2026-10-20 | |
| RPO | at 2026-06-30 | $104.70B | 10-Q filed 2026-07-21 | |
| RPO | at 2026-03-31 | $95.60B | 10-Q filed 2026-04-21 | |
| RPO | at 2025-12-31 | $95.70B | 10-K filed 2026-01-27 | |
| RPO | at 2025-09-30 | $91.40B | 10-Q filed 2025-10-21 | |
| RPO | at 2025-06-30 | $89.70B | 10-Q filed 2025-07-22 | |
| RPO | at 2025-03-31 | $92.80B | 10-Q filed 2025-04-22 | |
| RPO | at 2024-12-31 | $91.50B | 10-K filed 2025-01-30 | |
| RPO | at 2024-09-30 | $84.80B | 10-Q filed 2024-10-24 | |
| RPO | at 2024-06-30 | $83.10B | 10-Q filed 2024-07-25 | |
| RPO | at 2024-03-31 | $78.90B | 10-Q filed 2024-04-25 | |
| RPO | at 2023-12-31 | $84.20B | 10-K filed 2024-01-25 | |
| RPO | at 2023-09-30 | $83.90B | 10-Q filed 2023-10-26 | |
| RPO | at 2023-06-30 | $78.80B | 10-Q filed 2023-07-27 | |
| RPO | at 2023-03-31 | $77.50B | 10-Q filed 2023-04-27 | |
| RPO | at 2022-12-31 | $78.70B | 10-K filed 2023-01-26 | |
| RPO | at 2022-09-30 | $79.60B | 10-Q filed 2022-10-27 | |
| RPO | at 2022-06-30 | $80.00B | 10-Q filed 2022-07-28 | |
| RPO | at 2022-03-31 | $75.80B | 10-Q filed 2022-04-28 | |
| RPO | at 2021-12-31 | $76.00B | 10-K filed 2022-01-27 | |
| RPO | at 2021-09-30 | $74.80B | 10-Q filed 2021-10-28 | |
| RPO | at 2021-06-30 | $76.60B | 10-Q filed 2021-07-29 | |
| RPO | at 2021-03-31 | $79.30B | 10-Q filed 2021-04-29 | |
| RPO | at 2020-12-31 | $81.00B | 10-K filed 2021-01-28 | |
| RPO | at 2020-09-30 | $81.30B | 10-Q filed 2020-10-22 | |
| RPO | at 2020-06-30 | $70.00B | 10-Q filed 2020-07-30 | |
| RPO | at 2020-03-31 | $64.20B | 10-Q filed 2020-04-29 | |
| RPO | at 2019-12-31 | $64.80B | 10-K filed 2020-01-30 | |
| RPO | at 2019-09-30 | $65.00B | 10-Q filed 2019-10-24 | |
| RPO | at 2019-06-30 | $63.00B | 10-Q filed 2019-07-24 | |
| RPO | at 2019-03-31 | $57.30B | 10-Q filed 2019-04-24 |
All announcements
Download as CSV (includes how each row was counted).
2026 83 announcements
| Date | Recipient | Amount | % of RPO / revenue | Details |
|---|---|---|---|---|
| Northrop Grumman Systems Corp.Defense Logistics Agency | $25.4M maximum |
Northrop Grumman Systems Corp., Sunnyvale, California, has been awarded a maximum $25,406,155 firm-fixed-price, definite-quantity delivery order (SPE4AX-27-F-0542)……against a five-year basic ordering agreement (SPE4A1-22-G-0004) for flow control valves. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.103-1. This is a three-year contract with no option periods. The delivery order end date is Dec. 18, 2029. Using military service is Navy. Type of appropriation is fiscal 2027 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Navy | $56.0M | 0.05% of RPO0.13% of rev. |
Northrop Grumman Systems Corp., San Diego, California, was awarded a $55,986,538 firm-fixed-price modification (P00003) to a previously awarded delivery order……(N0001926F1093) under basic ordering agreement (N0001925G0003) for installation of the B7 Retrofit Material Kit on an MQ-4C Triton air vehicle. Work will be performed in Palmdale, California (64%); San Diego, California (34%); and various locations within the continental U.S. (2%), and is expected to be completed in May 2030. Fiscal 2027 aircraft procurement (Navy) funds in the amount of $55,986,538 will be obligated at the time of award. This contract modification was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland is the contracting activity. (Awarded Oct. 28, 2026). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrup Grumman Systems Corp.Navy | $43.9M | 0.04% of RPO0.10% of rev. |
Northrup Grumman Systems Corp., Magna, Utah, is awarded a $43,856,500 firm-fixed-price contract (N0003027C2002) to support the design of new rocket motor dry and grind……production facilities and equipment which will be located at the Naval Industrial Reserve Ordnance Plant (NIROP) in Magna, Utah. This effort supports the TRIDENT II (D5) Strategic Weapon System and work will be performed in Magna, Utah. Work is expected to be completed on Aug. 31, 2028. Fiscal 2026 weapons procurement (Navy) funds in the amount of $43,856,500 will be obligated on this award and no funds will expire at the end of this fiscal year. This contract was awarded as a sole source acquisition pursuant to 10 U.S. Code 2304(c)(1). PAE Strategic Systems Programs, Washington, D.C., is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $66.0M | 0.06% of RPO0.16% of rev. |
Northrop Grumman Systems Corp., San Diego, California (N0001927F1026), is awarded a $66,041,453 firm-fixed-price delivery order under a basic ordering agreement……(N0001925G0003) for recurring engineering retrofit efforts, material, and spares to incorporate 17 engineering change proposals for the Navy and 16 engineering change proposals for the Royal Australian Air Force into fielded MQ-4C Triton unmanned aircraft systems. The effort supports fleet standardization and mission readiness. Work will be performed in Hayward, California (63%); San Diego, California (31%); Red Oak, Texas (1%); Waco, Texas (1%); Tukwila, Washington (1%); Elyria, Ohio (1%); Irvine, California (1%); and various locations within the continental U.S. (1%), and is expected to be completed in June 2030. Fiscal 2026 aircraft procurement (Navy) funds in the amount of $53,606,096; and Royal Australian Air Force cooperative-program funds in the amount of $12,435,357, will be obligated at the time of award. This delivery order was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Corp.Navy | $29.2M | 0.03% of RPO0.07% of rev. |
Northrop Grumman Corp., Charlottesville, Virginia, was awarded a $29,219,125 cost-plus-incentive-fee, cost-plus-fixed-fee, firm-fixed-price, and cost only contract for……low-rate initial production units and maintenance assistance modules, engineering support, integration, and test of the AN/WSN-12 Inertial Navigation System and other direct costs, travel and material. This contract includes options which, if exercised, would bring the cumulative value of this contract to $103,629,832. This contract combines purchases for the Navy (27%); and the governments of Canada (42%), and Australia (31%), under the Foreign Military Sales (FMS) program. Work will be performed in Charlottesville, Virginia (90%); and Baltimore, Maryland (10%), and is expected to be completed by May 2030. If all options are exercised, work will continue through July 2032. FMS (Canada) funds in the amount of $12,271,012 (42%); FMS (Australia) funds in the amount of $9,203,260 (31%); fiscal 2026 other procurement (Navy) funds in the amount of $4,677,100 (16%); and fiscal 2024 shipbuilding and conversion (Navy) funds in the amount of $3,067,753 (11%), were obligated at the time of award and will not expire at the end of the current fiscal year. This contract was not competitively procured in accordance with 10 U.S. Code 3204(a)(1) (only one responsible source and no other supplies or services will satisfy agency requirements). Naval Sea Systems Command, Washington, D.C., is the contracting activity (N00024-26-C-5207). (Awarded Sept. 30, 2026). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $10.4M | <0.01% of RPO0.02% of rev. |
Northrop Grumman Systems Corp., Meadows, Illinois, has been awarded a $10,407,606 modification (P00189) to a previously awarded contract (FA8615-17-C-6047) for F-16……Integrated Viper Electronic Warfare Suite-Electronic Warfare radio frequency compatibility, diminishing manufacturing sources and material shortages effort. The modification brings the total cumulative face value of the contract from $1,971,177,431 to $1,981,585,037. Work will be performed at Rolling Meadows, Illinois, and is expected to be completed by March 31, 2029. Fiscal 2025 procurement funds in the amount of $10,407,606 are being obligated at the time of award. The Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Defense Logistics Agency | $49.5M | 0.05% of RPO0.12% of rev. |
Northrop Grumman Systems Corp., Oklahoma City, Oklahoma, has been awarded an estimated $49,528,809 cost-plus-fixed-fee modification (P00010) to a six-year……firm-fixed-price contract (SPRTA1-23-C-0003) to extend the period of performance for the manufacture and repair of required tooling and production of B-2 rudder and elevon. This is a seven-year contract with no option periods. The performance completion date is March 27, 2030. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Tinker Air Force Base, Oklahoma. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $71.7M | 0.07% of RPO0.17% of rev. |
Northrop Grumman Systems Corp., Warner Robins, Georgia, has been awarded a $71,653,554 firm-fixed-price requirements contract for repair of the AN/APN-241 Low Power……Color Radar. This contract provides for depot-level maintenance, repair, testing, packaging, handling, storage, transportation, and associated data support for AN/APN-241 radar components. Work will be performed at Robins Air Force Base, Georgia, and is expected to be completed by Sept. 29, 2031. This contract was a sole-source acquisition. No funds are being obligated at the time of award; funds will be obligated through subsequent delivery orders. The Air Force Sustainment Center, Robins Air Force Base, Georgia, is the contracting activity (FA8538-26-D-0002). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $37.0M | 0.04% of RPO0.09% of rev. |
Northrop Grumman Systems Corp., Meadows, Illinois, has been awarded a $36,987,335 modification (P00187) to previously awarded (FA8615-17-C-6047) for F-16 Integrated……Viper Electronic Warfare Suite – Electronic Warfare Radio Frequency Compatibility, Big Iron effort. Work will be performed in Rolling Meadows, Illinois, and is expected to be completed by Dec. 31, 2029. Fiscal 2025 research, development, test and evaluation funds in the amount of $16,183,490 are being obligated at the time of award. Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $19.8M | 0.02% of RPO0.05% of rev. |
Northrop Grumman Systems Corp., Linthicum Heights, Maryland, is awarded a $19,849,996 firm-fixed-price job order (JO) against previously issued basic ordering agreement……(BOA) (N0016425GJW77) for the procurement of test program sets and automated test equipment to support depot repair testing of AN/ZPY-3 multi-function active sonar shop replaceable assemblies in support of the PMA-262 Program. This JO does not include options. Work will be performed in Linthicum Heights, Maryland, and is expected to be completed by April 2030. Fiscal 2026 aircraft procurement (Navy) funds in the amount of $7,035,383 (35%); and fiscal 2025 aircraft procurement (Navy) funds in the amount of $12,814,613 (65%), will be obligated at time of award. The BOA and resulting JO were awarded on a sole-source basis in which there is only one responsible source, and no other supplies or services can satisfy agency requirements in accordance with 10 U.S. Code 3204(a)(1). Naval Surface Warfare Center Crane, Crane, Indiana, is the contract activity (N0016426FM026). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $22.3M | 0.02% of RPO0.05% of rev. |
Northrop Grumman Systems Corp., Linthicum Heights, Maryland, has been awarded a $22,320,854 firm-fixed-price contract for F-35 radar sustainment. This contract provides……for sustainment for the F-35 radar. Work will be performed at Linthicum Heights, Maryland; and Robins Air Force Base, Georgia, and is expected to be completed by March 31, 2032. This contract was a sole source acquisition. Fiscal 2026 working capital funds in the amount of $3,682,496 are being obligated at time of award. The Air Force Sustainment Center, Robins AFB, Georgia, is the contracting activity (FA8579-26-C-0013). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $17.8M | 0.02% of RPO0.04% of rev. |
Northrop Grumman Systems Corp., Sunnyvale, California, was awarded $17,809,389 for a firm-fixed-price stand-alone contract for the manufacture of 157 ceramic ball……rotating assemblies in support of Navy Virginia-class submarines. The contract does not include an option period. All work will be performed in Sunnyvale, California, and work is expected to be completed by August 2028. Fiscal 2026 working capital (Navy) funds in the contract's full amount of $17,809,389 will be obligated at time of award and those funds will not expire at the end of the current fiscal year. One source was solicited for this sole-source requirement pursuant to the authority set forth in 10 U.S. Code 3204 (a)(1) and one offer was received. NAVSUP Weapon Systems Support, Mechanicsburg, Pennsylvania, is the contracting activity (N00104-26-C-YA55). (Awarded Sept. 23, 2026). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $111.4M | 0.11% of RPO0.27% of rev. |
Northrop Grumman Systems Corp., Roy, Utah, has been awarded a $111,366,000 firm fixed price and cost- plus-fixed-fee modification (P00067) to previously awarded……(FA8219-20-C-0006) for Ground Based Strategic Deterrent Engineering and Manufacturing Development and Early Production and Deployment. The modification brings the total cumulative face value of the contract to $13,473,182,364 from 13,361,816,364. Work will be performed in Warren, New Jersey and Kernersville, North Carolina, and is expected to be complete by Dec. 31, 2033. Fiscal 2025 Missile Procurement funds in the amount of $111,366,000 are being obligated at the time of award. The Air Force Nuclear Weapons Center, Hill Air Force Base, Utah is the contracting activity. (Awarded Sept. 24, 2026). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Defense Logistics Agency | $14.2M | 0.01% of RPO0.03% of rev. |
Northrop Grumman Systems Corp., Oklahoma City, Oklahoma, has been awarded an estimated $14,179,813 firm-fixed-price contract for the manufacture and production of B-2……alarm controls. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.103-1. This is a three-year contract with no option periods. The performance completion date is Dec. 31, 2029. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Tinker Air Force Base, Oklahoma (SPRTA1-26-C-0170). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $97.0M | 0.09% of RPO0.23% of rev. |
Northrop Grumman Systems Corp., Keyser, West Virginia, is awarded a $97,004,665 modification (P00005) to previously awarded firm-fixed-price……indefinite-delivery/indefinite-quantity contract (N0001924D0104). This modification increases the contract ceiling from $365,441,776 to $462,446,441 to support production requirements for the Fuze, Munition Unit (FMU)-139D/B Fuze System, accessory kits, trainer fuzes, power cables, closure rings, ancillary hardware, and fuzing units for the Navy, Air Force, and Foreign Military Sales customers. Work will be performed in Rocket Center, West Virginia (91%); Plymouth, Minnesota (7%); and McEwen, Tennessee (2%), and is expected to be completed in September 2030. No funds will be obligated at the time of award; funds will be obligated on individual orders as they are issued. This contract was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $87.4M | 0.08% of RPO0.21% of rev. |
Northrop Grumman Systems Corp., Rolling Meadows, Illinois, has been awarded an $87,417,804 modification (P00188) to previously awarded (FA8615-17-C-6047) for the……Integrated Viper Electronic Warfare Suite Electronic Warfare Radio Frequency Compatibility Program Low-rate Initial Production effort. The modification brings the total cumulative face value of the contract to $1,921,299,231 from $1,833,881,427. Work will be performed at Rolling Meadows, Illinois, and is expected to be completed by Dec. 31, 2029. Fiscal 2025 Research, Development, Test, and Evaluation in the amount of $11,000,000 and fiscal 2025 aircraft procurement funds in the amount of $68,372,717 are being obligated at the time of the award. The Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $123.8M | 0.12% of RPO0.30% of rev. |
Northrop Grumman Systems Corp., Linthicum Heights, Maryland, is awarded a not-to-exceed $123,781,000 fixed-price incentive (firm-target) contract for the procurement of……F-35 APG-85 Lot 7 long-lead materials, parts, components, and associated efforts necessary to support the delivery schedule for sixty-seven production radars for the Air Force, Marine Corps, and Navy. Work will be performed in Linthicum Heights, Maryland, and is expected to be completed in February 2031. Fiscal 2026 aircraft procurement (Air Force) funds in the amount of $66,527,000; and fiscal 2026 aircraft procurement (Navy) funds in the amount of $57,254,000 will be obligated at the time of award. This contract was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N0001926C1022). Official page Archived copy NOC prices around this date (Yahoo) |
|
| The Northrop Grumman Systems Corp.Defense Logistics Agency | $10.8M maximum |
The Northrop Grumman Systems Corp., Melbourne, Florida, has been awarded a maximum $10,762,018 firm-fixed-price delivery order (SPRPA1-26-F-D601) issued against a……five-year basic ordering agreement (SPRPA1-26-G-D601) for mission control displays. This was a sole-source acquisition using justification 10 U.S. Code 3204 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a three-year contract with no option periods. The delivery order end date is Feb. 9, 2029. Using customers are Navy and foreign military sales to France. Type of appropriation is fiscal 2026 through 2029 Navy working capital funds and foreign military sales funds. The contracting activity is Defense Logistics Agency Weapons Support, Philadelphia, Pennsylvania. Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Air Force | $11.5M | 0.01% of RPO0.03% of rev. |
Northrop Grumman Systems Corp., Warner Robins, Georgia has been awarded a $11,492,322 cost plus fixed fee requirements contract modification (P00015) to a previously……award contract (FA8524-20-D-0012) for engineering services to address Diminishing Manufacturing Sources for three components of the Receiver-Transmitter Processor applicable to the APN-241 Program. Work will be performed at Warner Robins, Georgia, and is expected to be completed by Sept. 25, 2027. No funds are being obligated at the time of the award. The Air Force Sustainment Center, Robins Air Force Base, Georgia, is the contracting activity. (Awarded Sept. 21, 2026) Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $11.9M | 0.01% of RPO0.03% of rev. |
Northrop Grumman Systems Corp., Melbourne, Florida, is awarded an $11,931,263 modification (P00139) to previously awarded cost-plus-fixed-fee contract (N0001918C1037).……This modification extends Software Support Activity efforts for E-2D Multi-Year Procurement II to the E-2D Advanced Hawkeye and provides software management, updates, maintenance, and life-cycle support for aircraft weapon system, subsystem, and support-element software for the Navy. Work will be performed in Melbourne, Florida, and is expected to be completed in February 2028. Fiscal 2024 aircraft procurement (Navy) funds in the amount of $11,931,263 will be obligated at the time of award. This modification was not competitively procured. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $34.4M | 0.03% of RPO0.08% of rev. |
Northrop Grumman Systems Corp., Woodland Hills, California, is awarded a $34,388,301 modification (P00005) to a firm-fixed-price indefinite-delivery/indefinite-quantity……contract (N0001924D0123). This modification increases the ceiling of an existing contract for potential to procure additional UH-1Y and AH-1Z Helicopter Link-16 A-Kits, B-Kits, and associated Spare Parts. Specifically, the contract quantities are increased by (8) UH-1Y Link 16 A Kits, (9) AH-1Z Link 16 A Kits, (17) Link 16 B Kits, and Spare Parts including Systems Engineering/Program Management and Logistics Support. Work will be performed in Chicago, Illinois (23%), Woodland Hills, California (22%), Salt Lake City, Utah (20%), San Diego, California (9%), Rancho Cucamonga, California (8%), Huntsville, Alabama (8%), Dallas, Texas (5%), Scottsdale, Arizona (2%), Rochester, New York (1%), and Other Localities below 1% (2%), and is expected to be completed by March 2027. No funds will be obligated at the time of award; funds will be obligated on individual orders as they are issued. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $34.4M | 0.03% of RPO0.08% of rev. |
Northrop Grumman Systems Corp., Woodland Hills, California, is awarded a $34,388,301 modification (P00005) to a firm-fixed-price, indefinite-delivery/indefinite-quantity……contract (N0001924D0123). This modification increases the ceiling of an existing contract for potential to procure additional UH-1Y and AH-1Z Helicopter Link-16 A-Kits, B-Kits, and associated Spare Parts. Specifically, the contract quantities are increased by eight UH-1Y Link 16 A Kits, nine AH-1Z Link 16 A Kits, 17 Link 16 B Kits, and spare parts including systems engineering and program management, and logistics support. Work will be performed in Chicago, Illinois (23%); Woodland Hills, California (22%); Salt Lake City, Utah (20%); San Diego, California (9%); Rancho Cucamonga, California (8%); Huntsville, Alabama (8%); Dallas, Texas (5%); Scottsdale, Arizona (2%); Rochester, New York (1%); and other localities below 1% (2%), and is expected to be completed by March 2027. No funds will be obligated at the time of award; funds will be obligated on individual orders as they are issued. This contract was not completed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Defense Logistics Agency | $18.7M maximum |
Northrop Grumman Systems Corp., Oklahoma City, Oklahoma, has been awarded a maximum $18,730,567 modification (P00024) to a delivery order (SPRTA1-16-F-0353) issued……against a base contract (SPE4AX-16-D-9479) for the manufacture and production of B-2 hot trailing edges. This is a firm-fixed-price, indefinite-quantity contract. Location of performance is Utah, with a July 10, 2029, delivery order completion date. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Tinker Air Force Base, Oklahoma. Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Army | $20.0M IDIQ ceiling |
Northrop Grumman Systems Corp., Radford, Virginia, was awarded a $19,999,798 firm-fixed-price, indefinite-delivery/indefinite-quantity contract to procure non-standard……ammunition. Two bids were solicited with two received. Work locations and funding will be determined with each order, with an estimated completion date of Oct. 1, 2027. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W519TC-26-F-A562). Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Army | $4.84B IDIQ ceiling |
Northrop Grumman Systems Corp., Rolling Meadows, Illinois, was awarded a $4,838,487,318 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for full rate……production of the Common Infrared Countermeasure. One bid was solicited with one received. Work locations and funding will be determined with each order, with an estimated completion date of Sept. 30, 2035. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W58RGZ-26-D-0056). Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Other agencies | $508.5M | 0.49% of RPO1.21% of rev. |
Northrop Grumman Systems Corp., Chandler, Arizona, is being awarded a noncompetitive, cost-plus-fixed-fee, cost reimbursable, and fixed-price-incentive contract. The……total value of this contract is $508,490,719.00. Under this follow-on contract, the contractor will provide flight test support for the remaining Intermediate Range Ballistic Missile/Intercontinental Ballistic Missile targets and integrated logistics support for all government furnished equipment in support of Missile Defense System testing. The work will be performed in Chandler, Arizona; Corinne, Utah; and Elkton, Maryland. The performance period is from September 2026 through August 2035. One offer was solicited and one offer was received. Fiscal 2026 research, development, test, and evaluation funds in the amount of $8,786,477.00 are being obligated on this award. The Missile Defense Agency, Huntsville, Alabama, is the contracting activity (HQ0855-26-C-E001). Note: amount taken from a later sentence Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.-Marine SystemsNavy | $111.4M IDIQ ceiling |
Northrop Grumman Systems Corp.-Marine Systems, Sunnyvale, California, is awarded a $111,354,038 firm-fixed-price and cost-only, indefinite-delivery/indefinite-quantity……contract for the ship service turbine generator maintenance, overhaul, repair, and long-lead time material in support of the in-service Virginia class nuclear-powered attack submarine fleet. This contract includes options which, if exercised, would bring the cumulative value to $253,293,127. Work will be performed in Sunnyvale, California (40%); Norfolk, Virginia (15%); Kittery, Maine (15%); Bremerton, Washington (15%); and Pearl Harbor, Hawaii (15%), and is expected to be completed by August 2031. If all options are exercised, work will continue through August 2034. No funds will be obligated at the time of the award; funds will be obligated on individual orders as they are issued. This contract was procured on a sole-source basis under the authority of 10 U.S. Code 3204(a)(1) only one responsible source and no other supplies or services will satisfy agency requirements. The Naval Sea Systems Command, Washington, D.C., is the contracting activity (N00024-26-D-4314). Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Army | $862.8M IDIQ ceiling |
Northrop Grumman Systems Corp., Minneapolis, Minnesota, was awarded an $862,848,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract to manufacture,……inspect, test, package and deliver M1156 precision guidance kits and variants. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Sept. 3, 2031. Army Contracting Command, Newark, New Jersey, is the contracting activity (W15QKN-26-D-A072). Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Air Force | $86.1M | 0.08% of RPO0.21% of rev. |
Northrop Grumman Systems Corp., Riverdale, Utah, has been awarded an $86,069,000 task order (FA8214-26-F-B017) under previously awarded ground subsystem support contract……2.0 FA8214-21-D-0002 for remote visual assessment (RVA) program support. This task order provides for program management, maintenance, sustaining engineering, and support services for the RVA program. Work will be performed at Hill Air Force Base, Utah; F.E. Warren AFB, Wyoming; Malmstrom AFB, Montana; and Minot AFB, North Dakota, and is expected to be completed by September 2031. This award is the result of a sole-source acquisition. Fiscal 2026 procurement funds in the amount of $15,240,085 are being obligated at the time of award. The Air Force Nuclear Weapons Center, Hill AFB, Utah, is the contracting activity (FA8214-26-F-B017). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $71.9M | 0.07% of RPO0.17% of rev. |
Northrop Grumman Systems Corp., McLean, Virginia, has been awarded a $71,927,435 engineering change proposal modification (P00060) to previously awarded contract……FA8750-23-F-0501 for InSITE software and hardware prototypes, InSITE capability procurement, fielding and installation with support, and InSITE engineering services. The modification brings the total cumulative face value of the order to $452,936,693 from $381,009,258. Work will be performed at McLean, Virginia, and is expected to be completed by Dec. 3, 2027. Fiscal 2025 research, development, test, and evaluation funds in the amount of $3,150,000, and Fiscal 2026 operation and maintenance funds in the amount of $3,972,836 are being obligated at time of award. The Air Force Research Laboratory, Computing, Communication, and Information Systems Contracting Branch, Rome, New York, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $215.9M | 0.21% of RPO0.51% of rev. |
Northrop Grumman Systems Corp., Colorado Springs, Colorado, has been awarded a $215,934,576 contract modification (P00018) to a previously awarded contract……(FA8820-24-C-B001) for Deep Space Advanced Radar Capability (DARC) Site 2. This modification provides pre-construction long-lead items, antenna hardware, antenna manufacturing, and pre-construction tasks for the DARC Site 2 radar. The modification brings the total cumulative face value of the contract to $495,375,991 from $279,441,415. Work will be performed at Colorado Springs, Colorado, and is expected to be completed by March 30, 2030. Fiscal 2025 research, development, test and evaluation funds in the amount of $51,443,472 are being obligated at the time of award. The Space Systems Command Directorate of Contracting, Peterson Space Force Base, Colorado, is the contracting activity. (Awarded on Aug 24, 2026). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrup Grumman Systems Corp.Navy | $12.7M | 0.01% of RPO0.03% of rev. |
Northrup Grumman Systems Corp., Magna, Utah, is being awarded a $12,695,572 modification (P0000) to a previously awarded and announced contract (N0003026C2038) to……provide services to complete capital maintenance projects and related capital maintenance studies. Projects completed as part of this effort are limited to non-severable improvements, repair, or modifications of Navy-owned land, buildings, and support utilities. Work will be performed in Magna, Utah. Work is expected to be completed April 1, 2030. Fiscal 2025 weapons procurement (Navy) funds in the amount of $12,695,572 will be obligated on this modification. This contract was awarded as a sole source acquisition pursuant to 10 U.S. Code 2304(c)(1). Strategic Systems Programs, Washington, D.C., is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop GrummanArmy | $158.8M | 0.15% of RPO0.38% of rev. |
Northrop Grumman, Rolling Meadows, Illinois, was awarded a $158,831,128 modification (PZ0003) to contract W58RGZ-26-C-0009 for the definitization of the contract. Work……will be performed in Rolling Meadows, Illinois, with an estimated completion date of Aug. 13, 2026. Fiscal 2026 revolving funds in the amount of $158,831,128 were obligated at the time of the award. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $46.1M | 0.04% of RPO0.11% of rev. |
Northrop Grumman Systems Corp., San Diego, California, is awarded a $46,089,540 firm-fixed-price modification to a previously awarded contract (N00024-24-C-6400) to……procure Joint Counter Radio-Controlled Improvised Explosive Device Electronic Warfare Increment One Block One systems, retrofit kits and spares. This modification also includes $4,199,955 in incremental funding for engineering support services and other direct costs. This contract involves Foreign Military Sales (FMS) to Australia. Work will be performed in Beaverton, Oregon (66%); and San Diego, California (34%), and is expected to be complete by December 2028. FMS (Australia) customer funds in the amount of $15,939,572 (32%); fiscal 2026 other procurement (Navy) funds in the amount of $13,608,567 (27%); fiscal 2026 other procurement (Air Force) funds in the amount of $10,133,080 (20%); fiscal 2026 operations and maintenance (Air Force) funds in the amount of $3,807,104 (7%); fiscal 2025 other procurement (Air Force) funds in the amount of $2,790,248 (6%); fiscal 2026 operations and maintenance (Navy) funds in the amount of $2,174,345 (4%); fiscal 2026 research, development, test and evaluation (Navy) funds in the amount of $1,370,014 (3%), and fiscal 2025 other procurement (Navy) funds in the amount of $466,565 (1%), will be obligated at time of award, and funds in the amount of $5,981,449 will expire at the end of the current fiscal year. The Portfolio Acquisition Executive Maritime, Washington, D.C., is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Corp.Navy | $18.1M | 0.02% of RPO0.04% of rev. |
Northrop Grumman Corp., Charlottesville, Virginia, is awarded a $18,121,584 firm-fixed-price modification to a previously awarded contract (N00024-23-C-5234) to exercise……options for the manufacture of Navy and Foreign Military Sales (FMS) surface and submarine inertial sensor module configurations and associated support equipment in support of the IWS 6 Navigation program. This contract combines purchases for the Navy (23%); and the governments of Canada (44%); and Australia (33%), under the FMS program. Work will be performed in Charlottesville, Virginia (84%); Salt Lake City, Utah (14%); Woodland Hills, California (1%); and Baltimore, Maryland (1%), and is expected to be completed by February 2029. FMS (Canada) funds in the amount of $7,990,232 (44%); FMS (Australia) funds in the amount of $5,992,674 (33%); fiscal 2026 other procurement (Navy) funds in the amount of $3,929,410 (22%); and fiscal 2025 other procurement (Navy) funds in the amount of $209,268 (1%), will be obligated at the time of award and will not expire at the end of the current fiscal year. Naval Sea Systems Command, Washington, D.C., is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $1.84B ceiling |
Northrop Grumman Systems Corp., Rolling Meadows, Illinois, has been awarded a $1,840,000,000 ceiling, indefinite-delivery/indefinite-quantity, firm-fixed-price contract……for Laser Infrared Targeting and Navigation Comprehensive Advanced Targeting Pod. This contract provides for continued sustainment, production, and modifications for the LITENING CATP. Work will be performed at Rolling Meadows, Illinois, and is expected to be completed by Dec. 31, 2035. This contract was a sole source acquisition. Fiscal 2026 operations and maintenance funds in the amount of $42,911,770 are being obligated at time of award. The Precision Attack Contracting Branch, Robins Air Force Base, Georgia, is the contracting activity (FA8540-26-D-B001). Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Aerospace SystemsAir Force | $17.7M | 0.02% of RPO0.04% of rev. |
Northrop Grumman Aerospace Systems, San Diego, California, has been awarded a $17,747,040 cost-plus-fixed-fee, indefinite-delivery requirements contract modification……(P00018) to previously awarded contract FA8539-21-D-0001 for a form, fit, function engineering change proposal of the digital receiver module of the RQ-4B Global Hawk Unmanned Air-Vehicle system. The modification brings the total cumulative face value of the contract to $618,228,400. Work will be performed at San Diego, California; El Segundo, California; and Forest, Mississippi, and is expected to be completed by Nov. 30, 2028. Fiscal 2026 contract depot maintenance direct cite funds in the amount of $17,747,040 are being obligated at the time of award. The Air Force Sustainment Center, Robins Air Force Base, Georgia, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrup Grumman System Corp.Air Force | pool $981.0M shared pool |
Amentum Technology Inc., Tullahoma, Tennessee (FA255326DB001); BAE Systems Inc., Broomfield, Colorado (FA255326DB002); CACI Inc., Chantilly, Virginia (FA255326DB003);……Firefly Aerospace, Leander, Texas (FA255326DB004); L3Harris Technologies Inc., Palm Bay, Florida (FA255326DB005); Lockheed Martin Space, Littleton, Colorado (FA255326DB006); Northrup Grumman System Corp., Dulles, Virginia (FA255326DB007); Pacific Crest Alliance, Colorado Springs, Colorado (FA255326DB008); Parsons Government Services Inc., Centreville, Virginia (FA255326DB009); Redwire Space Missions LLC, Littleton, Colorado (FA255326DB010); Rocket Lab USA Inc., Long Beach, California (FA255326DB011); Sierra Space Corp., Louisville, Colorado (FA255326DB012); The Boeing Co., Colorado Springs, Colorado (FA255326DB013); Viasat Inc., Carlsbad, California (FA255326DB014); and York Space Systems, Denver, Colorado (FA255326DB015), were awarded a ceiling $981,000,000 multiple award, indefinite-delivery/indefinite-quantity contract for National Space Test and Training Complex Innovative Technology and Engineering - Space Test and Range Capability Development. This contract provides for support to space and ground-based engineering activities to enhance test, evaluation, and training operations. Work will be performed at various locations and is expected to be completed by July 29, 2032. These contracts were competitive acquisitions, and twenty offers were received. No funds are being obligated at time of award. The Space Systems Command, Operational Test and Training Infrastructure, Colorado Springs, Colorado, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Navy | $21.1M | 0.02% of RPO0.05% of rev. |
Northrop Grumman Systems Corp., Melbourne, Florida, is awarded a $21,081,363 cost-plus-fixed-fee and firm-fixed-price order (N0001926F1043) against a previously issued……basic ordering agreement (N0001925G0003). This order procures non-recurring engineering, including software development, modifications to the E-2D Avionics Flight Management Computer, systems engineering, integration, and test activities, to integrate the Second Generation Anti-jam Tactical Ultra High Frequency Radio (SATURN) for NATO capability into the E-2D Advanced Hawkeye aircraft. The order also procures the production and delivery of 94 SATURN modification kits. Work will be performed in Melbourne, Florida (99.1%); West Chester, Ohio (0.6%); Ronkonkoma, New York (0.2%); and Laval, Quebec, Canada (0.1%), and is expected to be completed in April 2028. Fiscal 2026 aircraft procurement (Navy) funds in the amount of $21,081,363 will be obligated at the time of award. This order was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Army | $27.9M | 0.03% of RPO0.07% of rev. |
Northrop Grumman Systems Corp., McLean, Virginia, was awarded a $27,888,512 modification (PZ0004) to contract W31P4Q-26-C-0011 to definitize an undefinitized contract……action for engineering support, integrated product support, field service representative support, and training and training material support software products. One bid was solicited with one received. Work will be performed in McLean, Virginia, with an estimated completion date of Jan. 21, 2029. Fiscal 2026 aircraft procurement, Army funds in the amount of $9,317,073 were obligated at the time of the award. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $1.20B | 1.14% of RPO2.85% of rev. |
Northrop Grumman Systems Corp., Aerospace Systems. Melbourne, Florida, is awarded a not-to-exceed $1,196,000,000 cost, no fee undefinitized contract for the production,……delivery, and associated support for three E-2D Advanced Hawkeye Block II aircraft for the Navy. Work will be performed in Melbourne, Florida (29.88%); St. Augustine, Florida (17.68%); Liverpool, New York (13.85%); Indianapolis, Indiana (4.95%); Largo, Florida (3.66%); San Leandro, California (2.52%); Woodland Hills, California (2.42%); Aire-sur-l’Adour, France (2.09%); Rolling Meadows, Illinois (1.72%); Wimborne Minster, Dorset, United Kingdom (0.01%); and various locations within the continental U.S. (21.22%), and is expected to be completed in December 2031. Fiscal 2026 aircraft procurement (Navy) funds in the amount of $583,394,000 will be obligated at the time of award. This contract was not competed in accordance with 10 U.S. Code 2304(c)(1). Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N0001926C1017). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $14.8M | 0.02% of RPO0.04% of rev. |
Northrop Grumman Systems Corp., Baltimore, Maryland, has been awarded a $14,776,103 cost-plus-fixed-fee contract for research and development. This contract provides for……algorithm development for multiple sensors. Work will be performed at Baltimore, Maryland, and is expected to be completed by October 17, 2031. This contract was a competitive acquisition, and seven offers were received. Fiscal 2026 research, development, test and evaluation funds in the amount of $1,000,000 are being obligated at the time of award. The Air Force Research Laboratory, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA2377-26-C-B034). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $42.0M | 0.04% of RPO0.10% of rev. |
Northrop Grumman Systems Corp., Rolling Meadows, Illinois, is awarded a $42,007,410 modification (P00019) to a previously awarded fixed-price incentive (firm-target),……cost-plus-fixed-fee, cost reimbursable contract (N0001923C0001). This modification adds scope for the fabrication, assembly, testing, and delivery of AN/APR-39 D(V)2 Radar Warning Receiver/Electronic Warfare Management Systems hardware, to include 30 processors (29 for the Navy and one for the government of Morocco), 116 antenna detectors (112 for the Navy and four for the government of Morocco), 86 radar receivers (84 for the Navy and two for the government of Morocco), 32 low-band arrays (31 for the Navy and one for the government of Morocco), and 37 battery handle assemblies (36 for the Navy and one for the government of Morocco), as well as associated technical, engineering, management, and logistics support in support of various aircraft. Work will be performed in Rolling Meadows, Illinois (60.27%); Woburn, Massachusetts (10.78%); San Leandro, California (8.01%); Lansdale, Pennsylvania (6.88%); Lewisburg, Tennessee (3.61%); Longmont, Colorado (2.3%); Verona, Wisconsin (1.53%); Newark, Delaware (1.23%); and various locations within the continental U.S. (5.39%), and is expected to be completed in December 2029. Fiscal 2026 aircraft procurement (Navy) funds in the amount of $37,172,757; fiscal 2025 aircraft procurement funds in the amount of 2,826,025; fiscal 2024 aircraft procurement (Navy) funds in the amount of $676,048; and Foreign Military Sales customer funds in the amount of $1,332,579 will be obligated at the time of award. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp., Mission Systems SectorNavy | $39.4M | 0.04% of RPO0.09% of rev. |
Northrop Grumman Systems Corp., Mission Systems Sector, Linthicum Heights, Maryland, is being awarded a $39,400,521 cost-plus-fixed-fee modification to a previously……awarded contract (N00024-22-C-5520) to exercise an option for design agent engineering support of Surface Electronic Warfare Improvement Program Block Three systems. Work will be performed in Baltimore, Maryland, and is expected to be complete by August 2027. Fiscal 2026 shipbuilding and construction (Navy) funds in the amount of $6,000,000 will be obligated at time of award and will not expire at the end of the current fiscal year. Naval Sea Systems Command, Washington, D.C., is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $60.4M | 0.06% of RPO0.14% of rev. |
Northrop Grumman Systems Corp., Rolling Meadows, Illinois, has been awarded a $60,438,241 cost-plus-fixed-fee contract for Large Aircraft Infrared Countermeasures……(LAIRCM) Optical Detection and Identification Node. This contract provides for development of an enhanced sensor as part of the LAIRCM system. Work will be performed in Rolling Meadows, Illinois, and is expected to be completed by April 30, 2029. This contract was a sole-source acquisition. Fiscal 2026 research, development, test and evaluation funds in the amount of $11,200,000 are being obligated at the time of award. The Air Force Life Cycle Management Center, Wright Patterson Air Force Base, Ohio, is the contracting activity (FA8638-26-F-B001). (Awarded July 8, 2026) Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $49.0M | 0.05% of RPO0.12% of rev. |
Northrop Grumman Systems Corp., Mclean, Virginia, was awarded an undefinitized contract action letter contract with a not-to-exceed ceiling value of $49,000,000 for……Joint Tactical Ground Station (JTAGS) sustainment. This contract provides contractor logistics support and engineering services for the JTAGS program. Work will be performed in Colorado Springs, Colorado, and various locations globally, and is expected to be completed by June 30, 2027. This contract was a sole source acquisition. Fiscal 2026 operations and maintenance funds in the amount of $13,500,000; and fiscal 2026 research, development, test, and evaluation funds in the amount of $5,500,000 are being obligated at time of award. Space Systems Command Directorate of Contracting, Peterson Space Force Base, Colorado, is the contracting activity (FA8815-26-C-B002). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Defense Logistics Agency | $9.4M maximum |
Northrop Grumman Systems Corp., El Segundo, California, has been awarded a maximum $9,380,995 modification (P00001) to a delivery order (SPE4A5-25-F-7812) issued against……a two-year subsumable contract (SPE4AX-21-D-P002) with one five-year option period for LEX R/H wing extensions. This is a firm-fixed-price contract. The delivery order completion date is Sept. 12, 2028. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Defense Logistics Agency | $9.4M maximum |
Northrop Grumman Systems Corp., El Segundo, California, has been awarded a maximum $9,425,888 modification (P00001) to a delivery order (SPE4A5-25-F-7810) issued against……a two-year subsumable contract (SPE4AX-21-D-P002) with one five-year option period for LEX L/H wing extensions. This is a firm-fixed-price contract. The delivery order completion date is July 7, 2028. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp., Mission Systems SectorNavy | $312.3M | 0.33% of RPO0.74% of rev. |
Northrop Grumman Systems Corp., Mission Systems Sector, Linthicum Heights, Maryland, was awarded a $312,338,052 firm-fixed-price modification to a previously awarded……contract (N00024-20-C-5519) to exercise an option for the production of Surface Electronic Warfare Improvement Program Block Three Hemisphere and Quadrant systems. Work will be performed in Baltimore, Maryland (33%); Tampa, Florida (10%); Chelmsford, Maryland (8%); Sykesville, Maryland (7%); San Diego, California (5%); Hudson, New Hampshire (4%); Woburn, Massachusetts (4%); Rochester, New York (3%); Nashua, New Hampshire (3%); Glendale, Arizona (2%); Denver, Colorado (2%); Washington, North Carolina (2%); Longmont, Colorado (1%); Cincinnati, Ohio (1%); and miscellaneous locations each less than 1% (15%), and is expected to be completed by August 2029. Fiscal 2026 shipbuilding and construction (Navy) funds in the amount of $312,338,052 will be obligated at time of award and will not expire at the end of the current fiscal year. Naval Sea Systems Command, Washington, D.C., is the contracting activity. (Awarded June 24, 2026) Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Army | pool $83.6M shared pool |
Northrop Grumman Systems Corp., Plymouth, Minnesota (W15QKN-26-D-0013); General Dynamics Ordnance and Tactical Systems, Marion, Illinois (W15QKN-26-D-0014); and AMTEC……Corp.,* Janesville, Wisconsin (W15QKN-26-D-0015), will compete for each order of the $83,600,000 cost-plus-fixed-fee, firm-fixed-price contract for non-recurring engineering development, manufacturing, design and testing support interoperable with 20mm, 25mm, 30mm x 113mm, 30mm x 173mm, and 50mm weapon systems. Bids were solicited via the internet with five received. Work locations and funding will be determined with each order, with an estimated completion date of June 23, 2031. Army Contracting Command, Newark, New Jersey, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Navy | $23.4M | 0.02% of RPO0.06% of rev. |
Northrop Grumman Systems Corp., San Diego, California, is awarded a $23,399,824 cost-plus-fixed-fee and firm-fixed-price order (N0001926F1093) against a previously……issued basic ordering agreement (N0001925G0003). This contract procures one retrofit kit necessary to retrofit the MQ-4C Triton Unmanned Air Vehicle B7 to an integrated functional configuration 4.2.3 and one retrofit kit necessary to retrofit the MQ-4C Triton Unmanned Aircraft System Main Operating Base-2 to an integrated function configuration 4.2.4; 6 months of preservation and storage for the MQ-4 Triton UAS Air Vehicle B7; and non-recurring engineering to support the retrofit of MQ-4C Triton UAS Air Vehicle B7 and retrofit of MQ-4C Triton UAS Main Operating Base MB-2. Work will be performed in Palmdale, California (61%); San Diego, California (35%); Whidbey Island, Washington (2%); and various other locations within the continental U.S. each under 1% (2%), and is expected to be completed in April 2030. Fiscal 2025 aircraft procurement (Navy) funds in the amount of $9,777,741; fiscal 2026 aircraft procurement (Navy) funds in the amount of $13,498,908; and fiscal 2026 operations and maintenance (Navy) funds in the amount of $123,175, will be obligated at the time of award; $123,175 of which will expire at the end of the current fiscal year. This order was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $14.2M | 0.01% of RPO0.03% of rev. |
Northrop Grumman Systems Corp., Linthicum Heights, Maryland, has been awarded a $14,215,800 modification (P00178) to previously awarded FA8615-17-C-6047 for Active……Electronically Scanned Array radars of Air Force F-16 aircraft. The modification brings the total cumulative face value of the contract to $1,836,144,779 from $1,821,928,979. Work will be performed at Linthicum Heights, Maryland, and is expected to be completed by May 31, 2031. Fiscal 2024 procurement funds in the amount of $2,843,160; fiscal 2026 procurement funds in the amount of $8,529,480; and fiscal 2026 research, development, test and evaluation funds in the amount of $2,843,160, are being obligated at time of award. The Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Army | $30.8M | 0.03% of RPO0.07% of rev. |
Northrop Grumman Systems Corp., Huntsville, Alabama, was awarded a $30,759,214 modification (PZ0001) to contract W31P4Q-25-C-0005 for sustainment of the WISLA Integrated……Air and Missile Defense Battle Command System. The modification brings the total cumulative face value of the contract to $78,426,063. Work will be performed in Huntsville, Alabama, with an estimated completion date of Dec. 31, 2029. Fiscal 2026 Foreign Military Sales (Poland) funds in the amount of $30,759,214 were obligated at the time of the award. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Corp., Northrop Grumman Missions SystemsNavy | $61.3M | 0.06% of RPO0.15% of rev. |
Northrop Grumman Corp., Northrop Grumman Missions Systems, Linthicum, Maryland, is awarded a $61,333,595 firm-fixed-price contract for the production and delivery of 28……B-Kit Shop Replaceable Assemblies in support of EA-18G AN/ALQ-218 Weapons Replaceable Assembly (WRA)-7 processor unit; 30 B-Kit SRAs in support of EA-18G AN/ALQ-218 WRA-8 Digital Measurement Receiver (DMR); and 77 Low Band Dedicated Receiver SRAs in support of EA-18G AN/ALQ-218 WRA-8 DMR as well as associated technical data in support of upgrading the AN/ALQ-218 tactical jamming receivers for the Navy. Work will be performed in Linthicum, Maryland (80%) and Bethpage, New York (20%), and is expected to be completed in February 2030. Fiscal 2026 aircraft procurement (Navy) funds in the amount of $61,333,595 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N0001926C0111). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $100.0M IDIQ ceiling |
Northrop Grumman Systems Corp., Chandler, Arizona, is awarded a cost-plus-fixed-fee, cost reimbursable $99,959,797 indefinite-delivery/indefinite-quantity contract for……the production and delivery of flight trajectories and technical data packages associated with Ground Launch Drone Missile GQM-163A aerial target launches. The contract also provides for the operation, maintenance, and loading of GQM-163A targets onto launchers prior to target launch in support of the Navy’s Pacific Target Marine Operations Division. Work will be performed in Chandler, Arizona (30%); Point Mugu, California (27%); Las Cruces, New Mexico (15%); Wallops Island, Virginia (12%); Barking Sands, Hawaii (6%); Hebrides, Scotland United Kingdom (6%); undisclosed location, Israel (3%); and Indianapolis, Indiana (1%) and is expected to be completed in May 2031. No funds will be obligated at the time of award; funds will be obligated on individual orders as they are issued. This contract was not competed. Naval Air Warfare Center Weapons Division, Point Mugu, California, is the contracting activity (N6893626D5002). Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Air Force | $76.6M IDIQ ceiling |
Northrop Grumman Systems Corp., McLean, Virginia, has been awarded a ceiling $76,594,768 indefinite-delivery/indefinite-quantity contract for B-1 Radar Engineering……Sustainment & Support Service BRASS II. This contract provides for personnel and equipment for analysis, design, building, manufacturing process improvements, testing, and integration of technology solutions for the B-1 Radar AN/APQ-164. Work will be performed at McLean, Virginia, and is expected to be completed by May 31, 2031. This contract was a sole source acquisition. Fiscal year 2026 operations and maintenance funds in the amount of $6,907,576 are being obligated at time of award. The Air Force Life Cycle Management Center, Oklahoma City, Oklahoma, is the contracting activity (FA8138-26-D-B001). (Awarded on May 22, 2026.) Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Air Force | $49.0M IDIQ ceiling |
Northrop Grumman Systems Corp., Buffalo, New York, has been awarded a $49,000,000 indefinite-delivery/indefinite-quantity contract for software support for the Joint……Threat Emitter program. This contract provides for software and engineering support, program management, spares, support equipment, and additional support services. Work will be performed in Buffalo, New York; and various Air Force bases, and is expected to be completed by May 19, 2033. This award is the result of a sole-source acquisition. Fiscal 2026 operation and maintenance funds in the amount of $1,676,221 are being obligated at the time of award. The Air Force Life Cycle Management Center, Hill Air Force Base, Utah, is the contracting activity (FA8210-26-D-B002). Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Navy | $697.0M maximum |
Northrop Grumman Systems Corp., Baltimore, Maryland, was awarded a maximum ceiling $697,000,000, firm-fixed-price and cost-plus-fixed-fee, basic ordering agreement (BOA)……for the procurement of follow-on sustainment engineering and logistics services (SELS) for Program Manager Expeditionary Radars. The work to be performed includes engineering changes, contractor logistics support, depot life cycle support, software support activity support, diminishing manufacturing sources and material shortages support, technical refresh, and studies and analyses. Additionally, the SELS BOA will provide for operational spares buys, as well as software development for current and future radar systems. Work locations will be determined by individual task orders and is expected to be completed by May 14, 2031. No funds will be obligated at the time of award. Funds will be obligated on individual task orders as they are issued. The contract was not competitively procured pursuant to Federal Acquisition Regulation 6.302-1(a)(2)(ii)(A) and (B) and (iii)(A) and (B), and 10 U.S. Code 3204(a)(1). Portfolio Acquisition Executive Marine Corps, Marine Corps Systems Command, Quantico, Virginia, is the contracting activity (M67854-26-G-0003). Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Navy | $23.0M | 0.02% of RPO0.05% of rev. |
Northrop Grumman Systems Corp., Charlottesville, Virginia, is awarded $22,985,844 for a fixed-price contract for the procurement of various quantities of five parts for……the Integrated Bridge Navigation System in support of guided missile destroyer ship classes. The contract does not contain an option provision. All work will be performed in Charlottesville, Virginia, and is expected to be completed by November 2027. Fiscal 2026 working capital funds (Navy) in the contract’s full amount of $22,985,844 will be obligated at the time of award and will not expire at the end of the current fiscal year. One company was solicited for this sole-source requirement pursuant to the authority set forth in 10 U.S. Code 3204 (a)(1), with one offer received. Naval Supply Systems Command Weapon Systems Support, Mechanicsburg, Pennsylvania, is the contracting activity (N00104-26-C-JA07). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Army | $325.5M | 0.34% of RPO0.78% of rev. |
Northrop Grumman Systems Corp., San Diego, California, was awarded a $325,531,920 cost-plus-fixed-fee contract for development of the RangeHawk universal payload……architecture prototype, a high-altitude long endurance airborne test resource to improve agility and adaptability of high-speed systems test data collection, including prototype development, air vehicle modification, sensor integration, and logistics preparation for demonstration and validation. Bids were solicited via the internet with one received. Work will be performed in San Diego, California, with an estimated completion date of May 14, 2031. Fiscal 2026 research, development, test, and evaluation, Army funds in the amount of $65,657,001 were obligated at the time of the award. Army Contracting Command, Orlando, Florida, is the contracting activity (W900KK-26-C-A002). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $196.1M | 0.21% of RPO0.47% of rev. |
Northrop Grumman Systems Corp., San Diego, California, is awarded a $196,066,981 modification (P00037) to a cost-plus-fixed-fee contract (N0001924C0005). This……modification exercises options to provide continued logistics and test support, and continued field service representatives technical support, as well as supports reach-back engineering support to ensure that the MQ-4C Triton air vehicle are mission-capable for Intelligence, Surveillance and Reconnaissance missions in support of the Navy and the Royal Australian Air Force (RAAF). Work will be performed in San Diego, California (37.1%); Patuxent River, Maryland (14.8%); Jacksonville, Florida (10.7%); Okinawa, Japan (7.2%); Mayport, Florida (6.9%); Whidbey Island, Washington (4.4%); Baltimore, Maryland (3.5%); Chantilly, Virginia (3.1%); Yigo, Guam (1.3%); various locations within the continental U.S. (CONUS) (2.4%); and various locations outside of the CONUS (8.6%), and is expected to be completed in May 2027. Fiscal 2026 operations and maintenance (Navy) funds in the amount of $51,093,769; fiscal 2026 aircraft procurement (Navy) funds in the amount of $21,087,224; fiscal 2026 research, development, test and evaluation (Navy) funds in the amount of $1,000,000; and RAAF Cooperative partner funds in the amount of $7,500,000, will be obligated at the time of award, $51,093,769 of which will expire at the end of the current fiscal year. This effort was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $398.0M | 0.42% of RPO0.95% of rev. |
Northrop Grumman Systems Corp., Redondo Beach, California, has been awarded a $398,000,000 firm-fixed-price contract for a satellite communication space vehicle. This……contract provides for the development of the SATCOM space vehicle with launch and on-orbit support. Work will be performed at Redondo Beach, California; Dulles, Virginia; and various other locations in the U.S., and is expected to be completed by July 11, 2030. This contract was a sole source acquisition under the authority of 10 U.S. Code 4022. Fiscal 2025 research and development funds in the amount of $24,000,000; and fiscal 2026 research and development funds in the amount of $78,000,000, are being obligated at time of award. The Space Systems Command, Los Angeles Air Force Base, California, is the contracting activity (FA8807-25-C-B001). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $30.6M | 0.03% of RPO0.07% of rev. |
Northrop Grumman Systems Corp., Meadows, Illinois, has been awarded a $30,617,137 modification (P00172) to previously awarded (FA8615-17-C-6047) for F-16 Integrated……Viper Electronic Warfare Suite Electronic Warfare Radio Frequency Compatibility Spiral 1 development phase completion effort. This modification provides for an increase in flight test releases and software development requirements. Work will be performed in Rolling Meadows, Illinois, and is expected to be completed by Sept. 30, 2027. Fiscal 2025 research, development, test, and evaluation funds in the amount of $20,000,000 are being obligated at the time of award. The total cumulative face value of the contract is $1,819,950,480. Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Air Force | $488.0M IDIQ ceiling |
Northrop Grumman Systems Corp., Linthicum Heights, Maryland, has been awarded a ceiling $488,000,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract……for F-16 System Program Office Foreign Military Sales (FMS) and Air Force/Navy support. This contract provides for the engineering and technical support of F-16 radar (APG 66/68). Work will be performed at Linthicum Heights, Maryland, and is expected to be completed by March 31, 2036. This contract involves FMS to Bahrain, Belgium, Chile, Denmark, Egypt, Greece, Indonesia, Iraq, Israel, Jordan, Korea, Morocco, Netherlands, Norway, Oman, Pakistan, Poland, Portugal, Romania, Thailand, and Türkiye. This contract was a sole source acquisition. Fiscal 2026 non-appropriated, Air Force, and Navy funds in the amount of $2,644,922 are being obligated at time of award. The Air Force Lifecycle Management Center, Hill Air Force Base, Utah, is the contracting activity (FA8232-26-D-B003). (Awarded April 27, 2026). Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Air Force | $207.9M | 0.22% of RPO0.50% of rev. |
Northrop Grumman Systems Corp., San Diego, California, has been awarded a $207,891,883 modification (P00026) to previously awarded contract FA8690-24-C-B001 for an……additional year of contractor logistics support services. The modification brings the total cumulative face value of the contract to $596,009,834 from $388,117,951. Work will be performed at Sacheon Air Base, Republic of Korea; Osan Air Base, Republic of Korea; Misawa Air Base, Japan; Naval Air Station Sigonella, Italy; and San Diego, California, and is expected to be completed by April 30, 2027. This contract involves Foreign Military Sales (FMS) to the Republic of Korea, the Japan Ministry of Defense, and the North Atlantic Treaty Organization. FMS funds in the amount of $78,042,653 are being obligated at time of award. Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $9.7M | 0.01% of RPO0.02% of rev. |
Northrop Grumman Systems Corp., Melbourne, Florida, is awarded $9,704,396 cost-plus-fixed-fee order (N0001926F0262) against a previously issued basic ordering agreement……(N0001925G0003). This order provides the required aircrew, flight test engineering, instrumentation, aircraft maintenance, and test management personnel to support integrated test and evaluation, to include test planning, execution, reporting, and deficiency disposition in accordance with approved test plans for the E-2D Advanced Hawkeye for the Navy. Work will be performed in Patuxent River, Maryland (83%); Melbourne, Florida (14.2%); and Liverpool, New York (2.8%), and is expected to be completed in March 2027. Fiscal 2026 research, development, test, and evaluation (Navy) funds in the amount of $9,704,396 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This contract action was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Other agencies | $475.3M | 0.50% of RPO1.13% of rev. |
Northrop Grumman Systems Corp. is being awarded a modification to the active Prototype Project Other Transaction Agreement (HQ0851-22-9-0002) with a value of……$475,297,523. This is an increase in dollar value of the current Agreement from $832,778,556 to $1,308,076,079. The Agreement was previously awarded through the Missile Defense Agency’s authority under 10 U.S. Code 4022(a)(2)(B). Under this award, the performer will continue to develop and define its Glide Phase Interceptor design concept with an accelerated schedule. The estimated completion date is June 2028. Funds from Section 20003 of Public Law 119-21 in the amount of $174,133,086 are being obligated at the time of award. Missile Defense Agency, Dahlgren, Virginia, is the contracting activity. (Awarded April 3, 2026). Note: no location given in the source Note: no contract number found Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Aeronautic SystemsAir Force | pool $200.0M shared pool |
Arctos Technology Solutions LLC, Beavercreek, Ohio (FA2391-26-D-B006); University of Dayton Research Institute, Dayton, Ohio (FA2391-26-D-B007); Booz Allen Hamilton……Inc., McLean, Virginia (FA2391-26-D-B008); Northrop Grumman Aeronautic Systems, El Segundo, California (FA2391-26-D-B009); Innoveering LLC, Bohemia, New York (FA2391-26-D-B010); and Lockheed Martin Aeronautics Co., Palmdale, California (FA2391-26-D-B011), were awarded a shared ceiling $200,000,000 indefinite-delivery/indefinite-quantity contract for research and development for multidisciplinary, aerodynamics, and structures technologies research. This contract provides basic, applied, advanced, and demonstration and validation research to develop and demonstrate, integrate, and transition new aerospace vehicle technologies to the warfighter. Work will be performed at the contractor's facility and is expected to be completed by April 9, 2037. These contracts were competitive acquisitions and eleven offers were received. Fiscal 2026 research, development, test and evaluation funds up to $15,000 are being obligated at the time of award. The Air Force Research Laboratory at Wright Patterson Air Force Base, Ohio, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Air Force | pool $1.84B shared pool |
Anduril Industries Inc., Costa Mesa, California (FA881926DB0011); Astranis Space Technologies Corp., San Francisco, California (FA881926DB013); BAE Systems, Space……Mission Systems Inc., Broomfield, Colorado (FA881926DB006); General Atomics Electromagnetic Systems, San Diego, California (FA881926DB008); Intuitive Machines LLC, Houston, Texas (FA881926DB014); L3Harris Technologies Inc., Rochester, New York (FA881926DB003); Lockheed Martin Corp., Littleton, Colorado (FA881926DB004); Millennium Space Systems Inc., El Segundo, California (FA881926DB005); Northrop Grumman Systems Corp., Dulles, Virginia (FA881926DB001); Quantum Space LLC, Rockville, Maryland (FA881926DB002); Redwire Space Missions LLC, Littleton, Colorado (FA881926DB012); Sierra Space Corp., Louisville, Colorado (FA881926DB007); True Anomaly Inc., Centennial, Colorado (FA881926DB009); and Turion Space Corp., Irvine, California (FA881926DB010), were awarded a ceiling $1,843,000,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for the Andromeda program. This contract provides for the procurement of space-based space domain awareness capability. Work will be performed at various vendor facilities as indicated above and is expected to be completed by April 8, 2036. These contracts were competitive acquisitions and 32 offers were received. Fiscal 2025 research, development, test, and evaluation funds in the amount of $1,400,000 are being obligated at time of award. The Space Systems Command, El Segundo, California, is the contracting activity. (Awarded April 7, 2026). Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Navy | $12.8M | 0.01% of RPO0.03% of rev. |
Northrop Grumman Systems Corp., Linthicum Heights, Maryland, is awarded a $12,846,275 cost-plus-fixed-fee and cost-only ceiling increase modification to a previously……awarded contract (N00024-22-C-5520) for Surface Electronic Warfare Improvement Program Block 3 Electronic Attack systems design agent engineering support. This contract includes options which, if exercised, would bring the cumulative value of this contract action to $52,011,440. Work will be performed in Baltimore, Maryland, and is expected to be completed by August 2026. If all options are exercised, work will continue through August 2027. Fiscal 2026 other procurement (Navy) funds in the amount of $5,379,390 (81%); fiscal 2026 operations and maintenance (Navy) funds in the amount of $905,815 (14%); and fiscal 2026 research, development, test, and evaluation funds in the amount of $331,550 (5%), will be obligated at time of award, of which $905,815 will expire at the end of the current fiscal year. This contract was not competitively procured in accordance with 10 U.S. Code 2304(c)(1) (only one responsible source and no other type of property or services will satisfy the needs of the agency). Naval Sea Systems Command, Washington, D.C., is the contracting activity (N00024-22-C-5520). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems CorporationAir Force | $18.9M | 0.02% of RPO0.05% of rev. |
Northrop Grumman Systems Corporation, Woodland Hills, California has been awarded a $18,930,001 modification (P00016) to previously awarded FA8128-21-D-0001 for Inertial……Navigation Element Engineering Services. The modification brings the total cumulative face value of the contract to $33,930,000 from $14,999,999. Work will be performed at Salt Lake City, Utah and is expected to be completed by March 4, 2032. No funds are being obligated at the time of award. The Air Force Nuclear Weapons Center, Air-Launched Cruise Missile Sustainment Contracting Division, Tinker Air Force Base, Oklahoma is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $96.1M | 0.10% of RPO0.23% of rev. |
Northrop Grumman Systems Corp., Rolling Meadows, Illinois, is awarded a $96,129,279 modification (P000026) to a previously awarded fixed-price incentive (firm-target)……contract (N0001922C0042). This modification procures the necessary hardware and systems engineering technical support, analysis, and studies to install the Department of Navy (DON) Large Aircraft Infrared Countermeasure (LAIRCM) system onto Department of War aircraft for DON and other customers. Hardware for this procurement includes the following weapon replaceable assemblies: 153 advanced threat warning sensors for the Navy; 13 control indicator unit replaceable replacements for the Navy, and 20 for the Air Force; 30 DON LAIRCM processor units for the Navy, and 17 for the Air Force; 52 guardian laser transmitter assemblies for the Navy; 20 high capacity cards for the Navy, and 29 for the Air Force; 29 smart connector assemblies for the Navy, and 18 for the Air Force; and 76 battery kits for the Navy, and 23 for the Air Force. Work will be performed in Rolling Meadows, Illinois (32%); Goleta, California (18%); Longmont, Colorado (10%); Apopka, Florida (8%); Blacksburg, Virginia (7%); Westminster, Colorado (6%); Verona, Wisconsin (4%); Ashburn, Virginia (4%); Carlsbad, California (3%); Lewisburg, Tennessee (3%); Salt Lake City, Utah (2%); Tipp City, Ohio (2%); and Amherst, New York (1%), and is expected to be completed in July 2028. Fiscal 2026 aircraft procurement (Navy) funds in the amount of $74,528,543; fiscal 2026 aircraft procurement (Air Force) funds in the amount of $6,336,620; fiscal 2026 research, development, test and evaluation funds in the amount of $40,000; fiscal 2025 aircraft procurement (Navy) funds in the amount of $9,532,674; fiscal 2025 aircraft procurement (Air Force) funds in the amount of $1,485,048; and Navy working capital funds in the amount of $4,206,394, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. The contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Army | $884.9M | 0.92% of RPO2.11% of rev. |
Northrop Grumman Systems Corp., Plymouth, Minnesota, was awarded an $884,878,799 cost-plus-fixed-fee, firm-fixed-price, and fixed-price with economic price adjustment……contract for procurement of the 120mm Advanced Multi-Purpose M1147 High Explosive Multi-Purpose with Tracer Cartridge for the Army and future Foreign Military Sales customers. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of March 28, 2031. Army Contracting Command, Newark, New Jersey, is the contracting activity (W15QKN-26-D-0003). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Corp.Navy | $127.3M | 0.13% of RPO0.30% of rev. |
Northrop Grumman Corp., Chandler, Arizona is awarded a $127,319,699 firm-fixed-price contract (N0001926C0122). This contract will procure the GQM-163A Coyote Supersonic……Sea-skimming Target Full Rate Production Lot 18. This procurement consists of 28 GQM-163A targets and associated support, and related technical and administrative data in support of the Navy; the government of Japan; and the government of Korea. Work will be performed in Camden, Arizona (53%); Chandler, Arizona (31%); St. Petersburg, Florida (6%); Oconomowoc, Wisconsin (4%); Montville, New Jersey (4%); Manassas, Virginia (1%); and various other contiguous U.S. locations under 1%, and is expected to be completed in August 2030. Fiscal 2026 weapon procurement (Navy) funds in the amount of $58,623,999; fiscal 2025 weapon procurement (Navy) funds in the amount of $9,676,624; and Foreign Military Sales funds in the amount of $9,019,076, will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrup Grumman Systems Corp.Navy | $9.9M | 0.01% of RPO0.02% of rev. |
Northrup Grumman Systems Corp., Magna, Utah, is being awarded a $9,894,043 cost-plus-fixed-fee contract (N0003026C2038). The contract provides for services to complete……capital maintenance projects and related capital maintenance studies. Projects completed as part of this effort are limited to non-severable improvements, repair, or modifications of Navy-owned land, buildings, and support utilities. Work will be performed in Magna, Utah. Work is expected to be completed April 1, 2030. Fiscal 2024 weapons procurement (Navy) funds in the amount of $34,344; fiscal 2025 weapons procurement (Navy) funds in the amount of $196,872; and fiscal 2026 weapons procurement (Navy) funds in the amount of $9,662,827, will be obligated on this award. Fiscal 2024 weapons procurement (Navy) funds in the amount of $34,344 will expire at the end of this fiscal year. This contract was awarded as a sole source acquisition pursuant to 10 U.S. Code 2304(c)(1). Strategic Systems Programs, Washington, D.C., is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Aeronautics SystemsNavy | $12.0M | 0.01% of RPO0.03% of rev. |
Northrop Grumman Aeronautics Systems, Melbourne, Florida, was awarded an $11,980,190 cost-plus-fixed-fee and cost-only modification to previously awarded contract……(N00024-22-C-6418) to exercise options for safety, logistics, engineering and depot support for airborne laser mine detection systems. Work will be performed in Melbourne, Florida, and is expected to be completed by March 2027. Fiscal 2026 operations and maintenance (Navy) funds in the amount of $796,788 will be obligated at time of award and will expire at the end of the current fiscal year. Naval Sea Systems Command, Washington, D.C., is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $12.7M | 0.01% of RPO0.03% of rev. |
Northrop Grumman Systems Corp., Sykesville, Maryland, is awarded a $12,689,872 modification (P00010) to a previously awarded cost-plus-fixed-fee contract……(N6833523C0248). This modification increases the contract ceiling to support additional tasking within scope in support of finalizing the development of the Advanced Recovery Control (ARC) phase III upgrade efforts. These efforts include the construction of ARC prototype systems, requirements and design verification, environmental testing, and engineering and test support for validation in support of the advancement in the Navy's aircraft recovery operations. Work will be performed in Sykesville, Maryland, and is expected to be completed in December 2027. Fiscal 2026 research, development, test, and evaluation (Navy) funds in the amount of $1,151,250 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This contract was not competed. Naval Air Warfare Command Aircraft Division, Lakehurst, New Jersey, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Defense Logistics Agency | $44.1M maximum |
Northrop Grumman Systems Corp., McLean, Virginia, has been awarded a maximum $44,112,370 firm-fixed-price, indefinite-delivery requirements contract for B-1B AN/ALQ-161A……Band Driver/Transmitters. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a three-year contract with no option periods. The performance completion date is March 1, 2029. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Warner Robins, Georgia (SPRWA1-26-D-0002). Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Navy | $225.1M | 0.24% of RPO0.54% of rev. |
Northrop Grumman Systems Corp., Melbourne, Florida, is awarded a $225,109,424 modification (P00011) to a cost-plus-incentive-fee contract (N0001925C0130). This……modification exercises options for the design, development, and delivery of all E-130J training weapons systems training materials/courseware, formerly known as E-XX prior to official designation, in support of the Take Charge and Move Out recapitalization program for the Navy. Work will be performed in Orlando, Florida (64%); Oklahoma City, Oklahoma (31%); and Melbourne, Florida (5%), and is expected to be completed in March 2027. Fiscal 2026 research, development, test and evaluation (Navy) funds in the amount of $54,904,255 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This contract was competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems CorporationAir Force | $76.7M | 0.08% of RPO0.18% of rev. |
Northrop Grumman Systems Corporation, Colorado Springs, Colorado, has been awarded $76,655,632 contract modification (P00009) to previously awarded (FA8820-24-C-B001)……for Deep Space Advanced Radar Capability Site 2. This modification provides for long-lead hardware items and vendor design support for the DARC Site 2 radar, including transmitters, antennas, and receivers. The modification brings the total cumulative value of the contract to $279,441,415 from $202,785,783. Work will be performed at Colorado Springs, Colorado and is expected to be completed by Feb. 4, 2030. No funds are being obligated at the time of award. The Space Systems Command Directorate of Contracting, Peterson Space Force Base, Colorado is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $198.0M ceiling |
Northrop Grumman Systems Corp., Melbourne, Florida, is being awarded a $198,000,000 ceiling-priced delivery order (N00383-26-F-S50R) under previously awarded basic……ordering agreement (N00383-22-G-S501) for the purchase of 608 power amplifier module spares in support of the E-2D Advanced Hawkeye aircraft. The delivery order does not include an option period. All work will be performed in Melbourne, Florida. Work is expected to be completed by February 2029. This announcement involves Foreign Military Sales (FMS) from Japan. Working capital funds (Navy) in the amount of $64,307,666; and FMS funds in the amount of $32,712,334, will be obligated at time of award, and funds will not expire at the end of the current fiscal year. One firm was solicited for this non-competitive requirement pursuant to the authority set forth in 10 U.S. Code. 3204 (a)(1), with one offer received. Naval Supply Systems Command, Weapon Systems Support, Philadelphia, Pennsylvania, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
||
| Northrop Grumman Systems Corp.Air Force | $50.0M | 0.05% of RPO0.12% of rev. |
Northrop Grumman Systems Corp., McLean, Virginia, was awarded a $50,000,000 time-and-materials, firm-fixed-price task order for commercial agile software development……services. This contract provides for direct sustainment and modernization of software development in support of the Strategy Mission Planning and Execution, Data Fusion, and Visualization suite of software applications. Work will be performed at Bellevue, Nebraska; and Offutt Air Force Base, Nebraska, and is expected to be completed by Oct. 31, 2031. This contract was a competitive acquisition, and one offer was received. Operations and maintenance funds in the amount of $685,155 are being obligated at time of award. The Air Force Nuclear Weapons Center, Command and Control Division, Offutt AFB, Nebraska, is the contracting activity (FA2217-26-F-B001). Official page Archived copy NOC prices around this date (Yahoo) |
|
| Northrop Grumman Systems Corp.Navy | $11.5M | 0.01% of RPO0.03% of rev. |
Northrop Grumman Systems Corp., Melbourne, Florida, is awarded an $11,506,788 modification (P00119) to a previously awarded cost-plus-fixed-fee contract (N0001918C1037).……This modification adds scope for the production and delivery of 82 obsolescence redesign weapons displays (67 for the Navy and 15 for the government of Japan) in support of E-2D Advanced Hawkeye aircraft modernization efforts. Work will be performed in Largo, Florida (89%); and Melbourne, Florida (11%), and is expected to be completed in March 2029. Fiscal 2024 aircraft procurement (Navy) funds in the amount of $9,388,857; and Foreign Military Sales customer funds in the amount of $2,117,931, will be obligated at the time of award, $9,388,857 of which will expire at the end of the current fiscal year. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Official page Archived copy NOC prices around this date (Yahoo) |
Which names count as NOC
Contract announcements name the legal entity that signed (often a subsidiary). These are the names matched to NOC and the rules that matched them.
- Northrop Grumman Systems Corp. 201
- Northrup Grumman Systems Corp. 17
- Northrop Grumman Systems Corp., Mission Systems Sector 8
- Northrop Grumman Corp. 5
- Northrop Grumman Aerospace Systems 3
- Northrop Grumman Systems Corporation 3
- Northrop Grumman Aeronautics Systems 3
- Northrop Grumman Mission Systems 3
- Northrop Grumman Defense Systems 3
- Northrop Grumman Corp. Marine System 3
- Northrop Grumman Systems Corp., Space Systems Division 3
- Northrop Grumman Systems Corp.-Marine Systems 2
- Northrop Grumman Systems Corp. – Space Systems Division 2
- Northrop Grumman Systems Corp., Military Aircraft Systems 2
- Northrup Grumman 2
- The Northrop Grumman Systems Corp. 1
- Northrop Grumman 1
- Northrup Grumman System Corp. 1
- Northrop Grumman Corp., Northrop Grumman Missions Systems 1
- Northrop Grumman Aeronautic Systems 1
- Northrop Grumman Marine Systems 1
- Northrop Grumman Space Systems 1
- Northrup Grumman Aeronautics Systems 1
- Northrop Grumman Systems Corp., Weapons System Division 1
- Northrop Grumman Systems 1
- Northrop Grumman Systems Corp.-Space Systems Division 1
- Northrop Grumman Launch Vehicles 1
- Northrop Grumman Systems Corp., Marine Systems 1
- Northrop Grumman Global Mission Readiness & Operations 1
- Northrop Grumman Systems Corp. - Marine Systems 1
- Northrup Grumman Systems Corp., Aerospace Systems 1
- Northrup Grumman Systems Corp. Aerospace Systems 1
- Northrop Grumman Systems Corp., doing business as Northrup Grumman Technical Services 1
- Northrop-Grumman 1
- Northrop Grumman Defense Systems Sector 1
- Northrop Grumman Systems Corp. Aerospace Systems 1
- Northrop Grumman Systems Corp., Launch Vehicles Division 1
| Rule (normalized name) | Valid from | Evidence | Note |
|---|---|---|---|
^northr[ou]p grumman\b | — | company name | Pattern also catches the 'Northrup' typo seen in the source |