Hangar

Research tool, not investment advice. Contract values are not revenue. Every figure links to the government announcement it came from.

Companies

GE GE Aerospace

GE price history on Yahoo Finance (external; Hangar doesn't show prices, why)

Definite, last 12 months$5.05B25 awards
Potential, last 12 months$891.5M15 ceilings / IDIQs
Definite since 2024$9.99B42 awards
Not counted6 4 repeat, 2 shared pool

Totals add up the rows below; click any amount to open its source. Contract values are paid out over years and are not revenue.

Definite awards per quarter, by branch

$0$1B$2B$3B$4B2024 Q1 · Navy: $47.7M ($47,714,606)2024 Q1 · Defense Logistics Agency: $14.5M ($14,471,128)24Q12024 Q2 · Navy: $28.3M ($28,300,895)2024 Q2 · Army: $1.13B ($1,128,042,359)24Q22024 Q3 · Navy: $42.6M ($42,552,316)24Q32024 Q4 · Navy: $117.0M ($117,042,020)24Q42025 Q1 · Air Force: $3.50B ($3,500,000,000)25Q12025 Q2 · Navy: $40.1M ($40,061,140)25Q22025 Q3 · Navy: $20.7M ($20,703,888)25Q32025 Q4 · Navy: $47.5M ($47,526,438)2025 Q4 · Army: $26.9M ($26,950,000)25Q42026 Q1 · Navy: $1.47B ($1,472,834,455)26Q12026 Q2 · Navy: $73.3M ($73,265,004)2026 Q2 · Army: $104.3M ($104,315,000)2026 Q2 · Defense Logistics Agency: $257.0M ($257,035,301)26Q22026 Q3 · Navy: $2.89B ($2,891,565,823)2026 Q3 · Air Force: $33.0M ($33,039,731)2026 Q3 · Defense Logistics Agency: $32.7M ($32,735,630)26Q32026 Q4 · Navy: $113.0M ($113,031,099)26Q4*
NavyArmyAir ForceDefense Logistics AgencyOther agencies* 2026 Q4 is in progress (data through 2026-11-06)
Chart data
QuarterNavyArmyAir ForceDefense Logistics AgencyOther agencies
2024 Q1$47.7M$14.5M
2024 Q2$28.3M$1.13B
2024 Q3$42.6M
2024 Q4$117.0M
2025 Q1$3.50B
2025 Q2$40.1M
2025 Q3$20.7M
2025 Q4$47.5M$26.9M
2026 Q1$1.47B
2026 Q2$73.3M$104.3M$257.0M
2026 Q3$2.89B$33.0M$32.7M
2026 Q4$113.0M

Backlog and revenue, from SEC filings

Backlog here is remaining performance obligations (RPO): the standard figure for contracted work not yet delivered. It is usually smaller than the "backlog" companies quote, because it leaves out unfunded orders and options. Values are as first reported; click a point or number to open the filing. How this works

GE spun off GE HealthCare (January 2023) and GE Vernova (April 2024). Figures filed before each spin-off include the businesses that later left, so the series jumps.

$0$100B$200B$300B2020202120222023202420252026FY2019 revenue: $95.21B (10-K filed 2020-02-24)FY2020 revenue: $79.62B (10-K filed 2021-02-12)FY2021 revenue: $74.20B (10-K filed 2022-02-11)FY2022 revenue: $76.56B (10-K filed 2023-02-10)FY2023 revenue: $67.95B (10-K filed 2024-02-02)FY2024 revenue: $38.70B (10-K filed 2025-02-03)FY2025 revenue: $45.85B (10-K filed 2026-01-29)RPO at 2019-03-31: $241.38B (10-Q filed 2019-04-30)RPO at 2019-06-30: $251.44B (10-Q filed 2019-07-31)RPO at 2019-09-30: $240.54B (10-Q filed 2019-10-30)RPO at 2019-12-31: $245.43B (10-K filed 2020-02-24)RPO at 2020-03-31: $240.38B (10-Q filed 2020-04-29)RPO at 2020-06-30: $227.60B (10-Q filed 2020-07-29)RPO at 2020-09-30: $226.67B (10-Q filed 2020-10-28)RPO at 2020-12-31: $230.60B (10-K filed 2021-02-12)RPO at 2021-03-31: $226.96B (10-Q filed 2021-04-27)RPO at 2021-06-30: $227.47B (10-Q filed 2021-07-27)RPO at 2021-09-30: $238.50B (10-Q filed 2021-10-26)RPO at 2021-12-31: $239.82B (10-K filed 2022-02-11)RPO at 2022-03-31: $240.74B (10-Q filed 2022-04-26)RPO at 2022-06-30: $242.00B (10-Q filed 2022-07-26)RPO at 2022-09-30: $240.76B (10-Q filed 2022-10-25)RPO at 2022-12-31: $251.00B (10-K filed 2023-02-10)RPO at 2023-03-31: $242.05B (10-Q filed 2023-04-25)RPO at 2023-06-30: $245.79B (10-Q filed 2023-07-25)RPO at 2023-09-30: $253.09B (10-Q filed 2023-10-24)RPO at 2023-12-31: $267.23B (10-K filed 2024-02-02)RPO at 2024-03-31: $265.87B (10-Q filed 2024-04-23)RPO at 2024-06-30: $159.76B (10-Q filed 2024-07-23)RPO at 2024-09-30: $166.09B (10-Q filed 2024-10-22)RPO at 2024-12-31: $171.63B (10-K filed 2025-02-03)RPO at 2025-03-31: $172.60B (10-Q filed 2025-04-22)RPO at 2025-06-30: $174.40B (10-Q filed 2025-07-21)RPO at 2025-09-30: $176.28B (10-Q filed 2025-10-21)RPO at 2025-12-31: $190.56B (10-K filed 2026-01-29)RPO at 2026-03-31: $211.30B (10-Q filed 2026-04-21)RPO at 2026-06-30: $210.79B (10-Q filed 2026-07-16)RPO at 2026-09-30: $212.08B (10-Q filed 2026-10-20)
RPO (backlog), as reported each quarterRevenue, each fiscal year (plotted at year end)

Backlog ÷ revenue

RPO at fiscal year end divided by that year's revenue, both from the same 10-K. 2× means about two years of revenue is already under contract.

0×2×4×6×FY2019: RPO $245.43B / revenue $95.21B = 2.58×2.6×FY2019FY2020: RPO $230.60B / revenue $79.62B = 2.90×2.9×FY2020FY2021: RPO $239.82B / revenue $74.20B = 3.23×3.2×FY2021FY2022: RPO $251.00B / revenue $76.56B = 3.28×3.3×FY2022FY2023: RPO $267.23B / revenue $67.95B = 3.93×3.9×FY2023FY2024: RPO $171.63B / revenue $38.70B = 4.43×4.4×FY2024FY2025: RPO $190.56B / revenue $45.85B = 4.16×4.2×FY2025
All values and their filings
FigurePeriodValueFilingLater revision
RPO ÷ revenueFY2025 (ended 2025-12-31)4.16×10-K filed 2026-01-29
RPO ÷ revenueFY2024 (ended 2024-12-31)4.43×10-K filed 2025-02-03
RPO ÷ revenueFY2023 (ended 2023-12-31)3.93×10-K filed 2024-02-02
RPO ÷ revenueFY2022 (ended 2022-12-31)3.28×10-K filed 2023-02-10
RPO ÷ revenueFY2021 (ended 2021-12-31)3.23×10-K filed 2022-02-11
RPO ÷ revenueFY2020 (ended 2020-12-31)2.90×10-K filed 2021-02-12
RPO ÷ revenueFY2019 (ended 2019-12-31)2.58×10-K filed 2020-02-24
Revenue RevenuesFY2025 (2025-01-01 to 2025-12-31)$45.85B10-K filed 2026-01-29
Revenue RevenuesFY2024 (2024-01-01 to 2024-12-31)$38.70B10-K filed 2025-02-03
Revenue RevenuesFY2023 (2023-01-01 to 2023-12-31)$67.95B10-K filed 2024-02-02$35.35B in 10-K filed 2026-01-29
Revenue RevenuesFY2022 (2022-01-01 to 2022-12-31)$76.56B10-K filed 2023-02-10$29.14B in 10-K filed 2025-02-03
Revenue RevenuesFY2021 (2021-01-01 to 2021-12-31)$74.20B10-K filed 2022-02-11$56.47B in 10-K filed 2024-02-02
Revenue RevenuesFY2020 (2020-01-01 to 2020-12-31)$79.62B10-K filed 2021-02-12$75.83B in 10-K filed 2023-02-10
Revenue RevenuesFY2019 (2019-01-01 to 2019-12-31)$95.21B10-K filed 2020-02-24$90.22B in 10-K filed 2022-02-11
RPOat 2026-09-30$212.08B10-Q filed 2026-10-20
RPOat 2026-06-30$210.79B10-Q filed 2026-07-16
RPOat 2026-03-31$211.30B10-Q filed 2026-04-21
RPOat 2025-12-31$190.56B10-K filed 2026-01-29
RPOat 2025-09-30$176.28B10-Q filed 2025-10-21
RPOat 2025-06-30$174.40B10-Q filed 2025-07-21
RPOat 2025-03-31$172.60B10-Q filed 2025-04-22
RPOat 2024-12-31$171.63B10-K filed 2025-02-03
RPOat 2024-09-30$166.09B10-Q filed 2024-10-22
RPOat 2024-06-30$159.76B10-Q filed 2024-07-23
RPOat 2024-03-31$265.87B10-Q filed 2024-04-23
RPOat 2023-12-31$267.23B10-K filed 2024-02-02
RPOat 2023-09-30$253.09B10-Q filed 2023-10-24
RPOat 2023-06-30$245.79B10-Q filed 2023-07-25
RPOat 2023-03-31$242.05B10-Q filed 2023-04-25
RPOat 2022-12-31$251.00B10-K filed 2023-02-10
RPOat 2022-09-30$240.76B10-Q filed 2022-10-25
RPOat 2022-06-30$242.00B10-Q filed 2022-07-26
RPOat 2022-03-31$240.74B10-Q filed 2022-04-26
RPOat 2021-12-31$239.82B10-K filed 2022-02-11
RPOat 2021-09-30$238.50B10-Q filed 2021-10-26
RPOat 2021-06-30$227.47B10-Q filed 2021-07-27
RPOat 2021-03-31$226.96B10-Q filed 2021-04-27
RPOat 2020-12-31$230.60B10-K filed 2021-02-12
RPOat 2020-09-30$226.67B10-Q filed 2020-10-28
RPOat 2020-06-30$227.60B10-Q filed 2020-07-29
RPOat 2020-03-31$240.38B10-Q filed 2020-04-29
RPOat 2019-12-31$245.43B10-K filed 2020-02-24
RPOat 2019-09-30$240.54B10-Q filed 2019-10-30
RPOat 2019-06-30$251.44B10-Q filed 2019-07-31
RPOat 2019-03-31$241.38B10-Q filed 2019-04-30

All announcements

Download as CSV (includes how each row was counted).

2026 40 announcements
DateRecipientAmount% of RPO / revenueDetails
General Electric Co.Navy $113.0M 0.05% of RPO0.25% of rev.
General Electric Co., Lynn, Massachusetts, is being awarded $113,031,099 for a not-to-exceed and ceiling-price, performance-based logistics contract to provide…
…sustainment support for two critical T700 401C engine components in support of the Navy's MH-60R/S and the Marine Corps' AH-1Z/UH-1 helicopters. This is a three-year base contract with no option periods. Work will be performed in Winfield, Kansas (92%); and Lynn, Massachusetts (8%). The contract's period of performance runs through September 2029. Fiscal 2027 working capital funds in the amount of $8,860,230 will be committed at the time of award to fund delivery order (N00383-27-F0U70)-of which $6,645,173 of that amount will be obligated, representing 75% of the total not-to-exceed amount of the delivery order-and will be awarded concurrently with the contract to initiate the contract period. None of the obligated funds will expire at the end of the current fiscal year. Subsequent delivery orders under the resultant contract will be funded with appropriate fiscal year working capital funds (Navy) and those funds will not expire. One source was solicited for this sole-source requirement pursuant to the authority set forth in 10 U.S. Code 3204 (a)(1) and one offer was received. Naval Supply Systems Command Weapon Systems Support, Philadelphia, Pennsylvania, is the contracting activity (N00383-27-D-U701).

Contract N00383-27-D-U701, contract; obligated at award $15.5M

General Electric Co.Defense Logistics Agency $9.2M maximum
General Electric Co., Cincinnati, Ohio, has been awarded a maximum $9,155,644 firm-fixed-price, one-time-buy delivery order (SPRTA1-26-F-0543) issued against a five-year…
…basic ordering agreement (SPEA1-24-G-0014) for F110aircraft turbine nozzles. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.103-1. This is a five-year contract with no option periods. The delivery order end date is Oct. 31, 2029. Using military service is Air Force. Type of appropriation is fiscal 2026 Air Force defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Oklahoma City, Oklahoma.

Contract SPRTA1-26-F-0543, order

General Electric Co.Defense Logistics Agency $47.8M maximum
General Electric Co., Lynn, Massachusetts, has been awarded a maximum $47,762,022 firm-fixed-price, one-time-buy delivery order (SPRTA1-26-F-0547) issued against a…
…five-year basic ordering agreement (SPE4A1-22-G-0010) for J-85 engine compressor rotors. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.302-1(a)(2). This is a five-year contract with no option periods. The delivery order end date is Sept. 30, 2029. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Oklahoma City, Oklahoma.

Contract SPRTA1-26-F-0547, order

General Electric Co.Defense Logistics Agency $10.8M repeat
General Electric Co., Cincinnati, Ohio, has been awarded a maximum $10,763,472 firm-fixed-price, one-time-buy delivery order (SPRTA1-26-F-0445) issued against a…
…five-year basic ordering agreement (SPEA1-24-G-0014) for F118 vane, fan and aircraft gas turbine engines. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.103-1. This is a five-year contract with no option periods. The delivery order end date is Aug. 31, 2031. Using military service is Air Force. Type of appropriation is fiscal 2026 Air Force defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Oklahoma City, Oklahoma.

Contract SPRTA1-26-F-0445, order

Note: repeat of text first announced on 2026-09-28 (not counted again)

General Electric Co.Defense Logistics Agency $39.9M repeat
General Electric Co., Lynn, Massachusetts, has been awarded a maximum $39,926,265 firm-fixed-price, one-time buy delivery order (SPRTA1-26-F-0288) issued against a basic…
…ordering agreement (SPE4A1-22-G-0010) for J85 air compressor cases. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.302-1 (a)(2). The delivery order completion date is Sept. 30, 2031. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Oklahoma City, Oklahoma.

Contract SPRTA1-26-F-0288, order

Note: repeat of text first announced on 2026-09-23 (not counted again)

General Electric Co.Defense Logistics Agency $10.8M maximum
General Electric Co., Cincinnati, Ohio, has been awarded a maximum $10,763,472 firm-fixed-price, one-time-buy delivery order (SPRTA1-26-F-0445) issued against a…
…five-year basic ordering agreement (SPEA1-24-G-0014) for F118 vane, fan and aircraft gas turbine engines. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.103-1. This is a five-year contract with no option periods. The delivery order end date is Aug. 31, 2031. Using military service is Air Force. Type of appropriation is fiscal 2026 Air Force defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Oklahoma City, Oklahoma.

Contract SPRTA1-26-F-0445, order

General Electric Co.Defense Logistics Agency $39.9M repeat
General Electric Co., Lynn, Massachusetts, has been awarded a maximum $39,926,265 firm-fixed-price, one-time buy delivery order (SPRTA1-26-F-0288) issued against a basic…
…ordering agreement (SPE4A1-22-G-0010) for J85 air compressor cases. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.302-1 (a)(2). The delivery order completion date is Sept. 30, 2031. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Oklahoma City, Oklahoma.

Contract SPRTA1-26-F-0288, order

Note: repeat of text first announced on 2026-09-23 (not counted again)

General Electric Co.Defense Logistics Agency $11.7M <0.01% of RPO0.03% of rev.
General Electric Co., Cincinnati, Ohio, has been awarded an estimated $11,713,066 firm-fixed-price delivery order (SPRTA1-26-F-2230) issued against a five-year basic…
…ordering agreement (SPE4A1-24-G-0014) or the manufacture of F108 aircraft stator case and vane assemblies. This is a five-year contract with no option periods. The performance completion date is Oct. 31, 2031. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Tinker Air Force Base, Oklahoma.

Contract SPRTA1-26-F-2230, order

General Electric Co.Defense Logistics Agency $20.4M maximum
General Electric Co., Cincinnati, Ohio, has been awarded a maximum $20,398,890 firm-fixed-price delivery order (SPRTA1-26-F-0245) issued against a basic ordering…
…agreement (SPE4A1-24-G-0014) with no option periods for the manufacture of F110 aircraft turbine rotors. This is a four-year contract with no option periods. The delivery order end date is May 31, 2030. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Aviation, Tinker Air Force Base, Oklahoma.

Contract SPRTA1-26-F-0245, order

General Electric Co.Defense Logistics Agency $21.0M <0.01% of RPO0.05% of rev.
General Electric Co., Cincinnati, Ohio, has been awarded an estimated $21,022,564 firm-fixed-price delivery order (SPRTA1-26-F-1525) issued against a five-year basic…
…ordering agreement (SPE4A1-24-G-0014) for the manufacture of F110 aircraft turbine rotors. This is a three-year contract with no option periods. The performance completion date is Dec. 31, 2029. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Tinker Air Force Base, Oklahoma.

Contract SPRTA1-26-F-1525, order

GE Aviation Systems LLCNavy $16.9M <0.01% of RPO0.04% of rev.
GE Aviation Systems LLC, Vandalia, Ohio, is awarded $16,869,310 for firm-fixed delivery order (N00383-26-F-TC08) under previously awarded basic ordering agreement…
…(N00383-22-G-TC01) for the repair of 270 Generator Control Units (GCU) used on the F/A-18 aircraft. The delivery order does not include an option provision. Work will be performed in Vandalia, Ohio. Work is expected to be completed by December 2028. Fiscal 2026 working capital funds in the amount of $16,869,310 will be committed at the time of award and those funds will not expire. One source was solicited for this sole-source requirement pursuant to the authority set forth in 10 U.S. Code 3204 (a)(1) and one offer was received. Naval Supply Systems Command Weapon Systems Support, Philadelphia, Pennsylvania, is the contracting activity (N00383-26-F-TC08).

Contract N00383-26-F-TC08, order

GE Aviation Systems LLC, Dowty PropellersAir Force $199.7M IDIQ ceiling
GE Aviation Systems LLC, Dowty Propellers, Sterling, Virginia, has been awarded a $199,700,000 Firm Fixed Price Requirements Indefinite Delivery Contract for three years…
…for the R-391 Propeller Assembly & Component Spares. This contract provides for the procurement and management of the propellers, subsystems, and components to support operational readiness of the F-130J aircraft for both the Air Force and Foreign Military Sales, specifically Australia and Egypt. Work will be performed at Gloucester, England, United Kingdom and Sterling, Virginia and is expected to be complete by Sept. 24, 2032. This contract was a sole source acquisition. No funds are being obligated at the time of award. The Air Force Life Cycle Management Center, C-130 Contracting Office Robins Air Force Base, Georgia, is the Contracting Activity (FA8504-26-D-B002).

Contract FA8504-26-D-B002, contract; obligated at award $0

General Electric Co.Defense Logistics Agency $39.9M maximum
General Electric Co., Lynn, Massachusetts, has been awarded a maximum $39,926,265 firm-fixed-price, one-time buy delivery order (SPRTA1-26-F-0288) issued against a basic…
…ordering agreement (SPE4A1-22-G-0010) for J85 air compressor cases. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.302-1 (a)(2). The delivery order completion date is Sept. 30, 2031. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Oklahoma City, Oklahoma.

Contract SPRTA1-26-F-0288, order

GE Aviation Systems LLCAir Force $33.0M 0.02% of RPO0.07% of rev.
GE Aviation Systems LLC, Grand Rapids, Michigan, was awarded a $33,039,731 firm-fixed-price contract for the JEDAI program crash survivable data recorder redesign. This…
…contract provides for the redesign of the crash survivable data recorder for the F-16 aircraft. Work will be performed at Grand Rapids, Michigan, and is expected to be completed by September 21, 2031. This contract was a sole source acquisition. Fiscal 2026 Working Capital funds in the amount of $33,039,731 are being obligated at time of award. The Air Force Life Cycle Management Center, Hill Air Force Base, Utah, is the contracting activity (FA8232-26-C-B011).

Contract FA8232-26-C-B011, contract; obligated at award $33.0M

General Electric Co.Navy $2.87B 1.36% of RPO6.27% of rev.
General Electric Co., Lynn, Massachusetts, is being awarded $2,874,696,513 for a not-to-exceed/ceiling-price performance-based logistics contract to provide logistics…
…support for 17 F414 engine components in support of the Navy’s F/A-18 E/F/G aircraft. This is a five-year base contract with no option periods. Work will be performed in Lynn, Massachusetts (90%); and Jacksonville, Florida (10%). Work is expected to be completed by August 2031. Fiscal 2026 working capital funds in the amount of $198,221,333 will be committed at the time of award to fund delivery order (N00383-26-F-UA01) of which $148,666,000 (75%) of that amount will be obligated, and will be awarded concurrently with the contract as an undefinitized contract action and those funds will not expire at the end of the current fiscal year. Subsequent delivery orders under the resultant contract will be funded with appropriate fiscal year working capital funds (Navy) and those funds will not expire. One source was solicited for this sole-source requirement pursuant to the authority set forth in 10 U.S. Code 3204 (a)(1) and one offer was received. Naval Supply Systems Command Weapon Systems Support, Philadelphia, Pennsylvania, is the contracting activity (N00383-26-D-UA01).

Contract N00383-26-D-UA01, contract; obligated at award $198.2M

General Electric Co.Defense Logistics Agency $319.5M maximum
General Electric Co., Lynn, Massachusetts, has been awarded a maximum $319,548,644 modification (P00045) exercising the first two-year four-month option period of a…
…six-year three-month base contract (SPE4AX-20-D-9445) with one two-year four-month option period and one one-year and five-month option period. This is a firm-fixed-price, requirements contract for J85 engine supplies. The performance completion date is Dec. 31, 2028. Using military services are Air Force and Navy. Type of appropriation is fiscal 2026 through 2029 defense appropriated funds and defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia.

Contract SPE4AX-20-D-9445, modification

General Electric Co.Defense Logistics Agency $10.2M maximum
General Electric Co., Lynn, Massachusetts, has been awarded a maximum $10,222,208 modification (P00012) to a delivery order (SPE4AX-25-F1356) issued against a five-year…
…nine-month base contract (SPE4AX-20-D-9445) with one four-year three-month option period for an additional lot payment for August 2026 under Performance Period Five for J85 engine supplies. The performance completion date is Aug. 31, 2026. Using military services are Air Force and Navy. Type of appropriation is fiscal 2026 defense appropriated funds and defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. (Awarded on July 28, 2026).

Contract SPE4AX-25-F-1356, modification; awarded 2026-07-28

General Electric Co.Defense Logistics Agency $10.2M maximum
General Electric Co., Lynn, Massachusetts, has been awarded a maximum $10,222,208 modification (P00011) to a delivery order (SPE4AX-25-F-1356) issued against a five-year…
…eight-month base contract (SPE4AX-20-D-9445) with one four-year four-month option period for an additional lot payment for July 2026 under Performance Period Five for J85 engine supplies. The performance completion date is July 31, 2026. Using military services are Air Force and Navy. Type of appropriation is fiscal 2026 defense appropriated funds and defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. (Awarded on June 29, 2026).

Contract SPE4AX-25-F-1356, modification; awarded 2026-06-29

General Electric AerospaceNavy $117.9M IDIQ ceiling
General Electric (GE) Aerospace, East Hartford, Connecticut, is awarded a $117,852,737 firm-fixed-price indefinite-delivery/indefinite-quantity contract (N0001926D1004).…
…This contract is for commercial depot-level services regarding standard rework of Navy and Marine Corps T700-GE-401 series engines, cold section modules and power turbine modules. Work will be performed in Winfield, Kansas (100%), and is expected to be completed in August 2028. No funds will be obligated at the time of award; funds will be obligated on individual orders as they are issued. The contract that is being modified was not competed. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

Contract N00019-26-D-1004, contract; obligated at award $0

General Electric Co.Army $77.8M 0.04% of RPO0.17% of rev.
General Electric Co., Lynn, Massachusetts, was awarded a $77,780,000 cost-plus-incentive-fee contract for continued engineering and manufacturing development efforts…
…under the Improved Turbine Engine Program. The amount of this action brings the total cumulative face value of the contract to $963,769,255. Bids were solicited via the internet with two received. Work will be performed in Lynn, Massachusetts, with an estimated completion date of Dec. 31, 2029. Fiscal 2026 research, development, test, and evaluation, Army funds in the amount of $77,780,000 were obligated at the time of the award. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W58RGZ-19-C-0003 P00109).

Contract W58RGZ-19-C-0003, modification; obligated at award $77.8M

GE Aviation Systems LLCNavy $26.7M 0.01% of RPO0.06% of rev.
GE Aviation Systems LLC, Vandalia, Ohio, is being awarded $26,732,664 for firm-fixed-price delivery order N00383-26-F-TC06 under previously awarded basic ordering…
…agreement (N00383-22-G-TC01) for the purchase of 63 generator control units used on the F/A-18 aircraft. All work will be performed in Vandalia, Ohio, and work will be completed by December 2026. Fiscal 2026 working capital funds (Navy) in the amount of $26,732,664 will be obligated at time of award and those funds will not expire at the end of the applicable fiscal year. One company was solicited for this sole-source requirement pursuant to the authority set forth in 10 U.S. Code 2304 (c)(1) and one offer received. Naval Supply Systems Command Weapon Systems Support, Philadelphia, Pennsylvania, is the contracting activity.

Contract N00383-26-F-TC06, order; obligated at award $26.7M

General Electric Co.Army $9.8M repeat
General Electric Co., Lynn, Massachusetts, was awarded a $9,780,000 modification (P00107) to contract W58RGZ-19-C-0003 for engineering and manufacturing development of…
…the Improved Turbine Engine for Apache and Black Hawk helicopters. The modification brings the total cumulative face value of the contract to $889,489,255. Work will be performed in Lynn, Massachusetts, with an estimated completion date of Dec. 31, 2029. Fiscal 2026 research, development, test and evaluation, Army funds in the amount of $9,780,000 were obligated at the time of the award. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W58RGZ-19-C-0003). (Awarded June 12, 2026)

Contract W58RGZ-19-C-0003, modification; obligated at award $9.8M; awarded 2026-06-12

Note: repeat of text first announced on 2026-06-15 (not counted again)

General Electric Co.Army $9.8M <0.01% of RPO0.02% of rev.
General Electric Co., Lynn, Massachusetts, was awarded a $9,780,000 modification (P00107) to contract W58RGZ-19-C-0003 for engineering and manufacturing development of…
…the Improved Turbine Engine for Apache and Black Hawk helicopters. The modification brings the total cumulative face value of the contract to $889,489,255. Work will be performed in Lynn, Massachusetts, with an estimated completion date of Dec. 31, 2029. Fiscal 2026 research, development, test and evaluation, Army funds in the amount of $9,780,000 were obligated at the time of the award. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W58RGZ-19-C-0003). (Awarded June 12, 2026)

Contract W58RGZ-19-C-0003, modification; obligated at award $9.8M; awarded 2026-06-12

General Electric Co.Defense Logistics Agency $27.0M 0.01% of RPO0.06% of rev.
General Electric Co., Lynn, Massachusetts, has been awarded an estimated $26,990,236 delivery order (SPE4AX-25-F-1284) issued against a six-year one-month base contract…
…(SPE4AX-20-D-9002) with one two-year seven-month and one one-year nine-month option periods for additional lot payments to Performance Period 5 for TF34 engine supplies. This was a sole-source acquisition using justification 10 U.S. code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a one-year contract with no option periods. The performance completion date is May 31, 2026. Using military services are Air Force and Navy. Type of appropriation is fiscal 2025 through 2026 defense appropriated funds and defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. (Awarded on Dec. 13, 2024).

Contract SPE4AX-25-F-1284, order; awarded 2024-12-13

General Electric Co.Defense Logistics Agency $51.5M 0.02% of RPO0.11% of rev.
General Electric Co., Lynn, Massachusetts, has been awarded an estimated $51,542,494 delivery order (SPE4AX-24-F-3871) issued against a six-year one-month base contract…
…(SPE4AX-20-D-9002) with one two-year seven-month and one one-year nine-month option periods for additional lot payments to Performance Period Four for TF34 engine supplies. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a one-year contract with no option periods. The performance completion date is Dec. 31, 2024. The using military services are Air Force and Navy. Type of appropriation is fiscal 2024 through 2025 defense appropriated funds and defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. (Awarded on Dec. 19, 2023).

Contract SPE4AX-24-F-3871, order; awarded 2023-12-19

General Electric Co.Defense Logistics Agency $20.4M <0.01% of RPO0.04% of rev.
General Electric Co., Lynn, Massachusetts, has been awarded an estimated $20,444,417 modification (P00010) to delivery order (SPE4AX-25-F-1356) issued against a…
…five-year six-month base contract (SPE4AX-20-D-9445) with one four-year six-month option period for additional lot payments for May and June 2026 under Performance Period Five for J85 engine supplies. The performance completion date is June 30, 2026. Using military services are Air Force and Navy. Type of appropriation is fiscal 2026 defense appropriated funds and defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. (Awarded on April 22, 2026).

Contract SPE4AX-25-F-1356, modification; awarded 2026-04-22

General Electric Co.Defense Logistics Agency $30.7M 0.01% of RPO0.07% of rev.
General Electric Co., Lynn, Massachusetts, has been awarded an estimated $30,666,625 modification (P00009) to a delivery order (SPE4AX-25-F-1356) issued against a…
…five-year six-month base contract (SPE4AX-20-D-9445) with one four-year six-month option period for additional lot payments for Feb., March and April 2026 under Performance Period Five for J85 engine supplies. The performance completion date is June 30, 2026. Using military services are Air Force and Navy. Type of appropriation is fiscal 2026 defense appropriated funds and defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. (Awarded on Jan. 28, 2026).

Contract SPE4AX-25-F-1356, modification; awarded 2026-01-28

General Electric Co.Defense Logistics Agency $9.8M <0.01% of RPO0.02% of rev.
General Electric Co., Lynn, Massachusetts, has been awarded an estimated $9,799,348 modification (P00008) to a delivery order (SPE4AX-25-F-1356) issued against a…
…five-year six-month base contract (SPE4AX-20-D-9445) with one four-year six-month option period for additional lot payment for January 2026 under Performance Period Five for J85 engine supplies. The performance completion date is June 30, 2026. Using military services are Air Force and Navy. Type of appropriation is fiscal 2026 defense appropriated funds and defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. (Awarded on Dec. 30, 2025).

Contract SPE4AX-25-F-1356, modification; awarded 2025-12-30

General Electric Co.Defense Logistics Agency $9.8M <0.01% of RPO0.02% of rev.
General Electric Co., Lynn, Massachusetts, has been awarded an estimated $9,799,348 modification (P00002) to delivery order (SPE4AX-25-F-1356) issued against a five-year…
…six-month base contract (SPE4AX-20-D-9445) with one four-year six-month option period for additional lot payment for December 2025 under Performance Period Five for J85 engine supplies. The performance completion date is Dec. 31, 2025. Using military services are Air Force and Navy. Type of appropriation is fiscal 2026 defense appropriated funds and defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. (Awarded on March 20, 2025).

Contract SPE4AX-25-F-1356, modification; awarded 2025-03-20

General Electric Co.Defense Logistics Agency $107.8M 0.05% of RPO0.24% of rev.
General Electric Co., Lynn, Massachusetts, has been awarded an estimated $107,792,833 delivery order (SPE4AX-25-F-1356) issued against a five-year six-month base…
…contract (SPE4AX-20-D-9445) with one four-year six-month option period for additional lot payments to Performance Period 5 for J85 engine supplies. This was a sole-source acquisition using justification 10 U.S. Code 3204 (a)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a one-year contract with no option periods. The performance completion date is Nov. 30, 2025. Using military services are Air Force and Navy. Type of appropriation is fiscal 2025 defense appropriated funds and defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia. (Awarded on Dec. 20, 2024).

Contract SPE4AX-25-F-1356, order; awarded 2024-12-20

General Electric Co.Defense Logistics Agency $9.1M maximum
General Electric Co., Lynn, Massachusetts, has been awarded a maximum $9,114,336 firm-fixed-price delivery order (SPRTA1-26-F-0175) issued against a five-year basic…
…ordering agreement (SPE4A1-24-G-0014) with no option periods for J85 aircraft turbine nozzle manufacturing. The delivery order end date is July 31, 2030. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Aviation, Tinker Air Force Base, Oklahoma. CORRECTION: The contract announced on April 24, 2026, for American Surgical Instrument Repair LLC,* Punta Gorda, Florida (SPE2DH-26-D-0010), for $15,600,000 was announced with an incorrect award date. The correct award date is April 28, 2026.

Contract SPRTA1-26-F-0175, order

General Electric AerospaceNavy $46.5M 0.02% of RPO0.10% of rev.
General Electric Aerospace, Lynn, Massachusetts, is awarded a $46,532,340 modification (P00005) to a firm-fixed-price contract (N0001924C0019). This modification adds…
…scope for the procurement of nine T408-GE-400 turboshaft engines, for Lot 10 variation in quantity, in support of CH-53K full-rate production aircraft for the Marine Corps. Work will be performed in Lynn, Massachusetts (labor surplus area), and is expected to be completed by September 2032. Fiscal 2026 aircraft procurement (Navy) funds in the amount of $46,532,340 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. This contract was not competed. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

Contract N00019-24-C-0019, modification; obligated at award $46.5M

General Electric Co.Army $16.8M <0.01% of RPO0.04% of rev.
General Electric Co., Lynn, Massachusetts, was awarded a $16,755,000 modification (P00104) to contract W58RGZ-19-C-0003 for additional funding to continue support of the…
…improved turbine engine program for engineering and manufacturing development efforts. The modification brings the total cumulative face value of the contract to $879,709,255. Bids were solicited via the internet with two received. Work will be performed in Lynn, Massachusetts, with an estimated completion date of Dec. 31, 2029. Fiscal 2026 Research, Development, Test, and Evaluation, Army funds in the amount of $16,755,000 were obligated at the time of the award. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.

Contract W58RGZ-19-C-0003, modification; obligated at award $16.8M

General Electric Co., doing business as Colibrium AdditiveDefense Logistics Agency pool $9.8M shared pool
AForge LLC,* Lorton, Virginia (SP4701-26-D-0001); Alloyed Inc.,* Seattle, Washington (SP4701-26-D-0002); Applied Rapid Technologies Co. Inc.,* Fredericksburg, Virginia…
…(SP4701-26-D-0003); General Electric Co., doing business as Colibrium Additive, West Chester, Ohio (SP701-26-D-0004); Cornerstone Research Group,* Miamisburg, Ohio (SP4701-26-D-0005); DMG MORI Federal Services Inc., Hoffman Estates, Illinois (SP4701-26-D-0007); FasTech LLC,* Danville, Virginia (SP4701-26-D-0008); Form Alloy Technologies Inc.,* Spring Valley, California (SP4701-26-D-0009); ITL LLC,* Hampton, Virginia (SP4701-26-D-0011); KVG LLC,* Gettysburg, Pennsylvania (SP4701-26-D-0012); American Lightweight Materials Manufacturing Innovation Institute, doing business as Lift Technologies, Detroit, Michigan (SP4701-26-D-0013); Malama Kai Technologies LLC,* Herndon, Virginia (SP4701-26-D-0014); Maritech Machine Inc.,* Panama City, Florida (SP4701-26-D-0015); Marotta Controls Inc.,* Montville, New Jersey (SP4701-26-D-0016); MRL Materials Resources LLC,* Xenia, Ohio (SP4701-26-D-0017); UI Labs, doing business as MXD USA, Chicago, Illinois (SP4701-26-D-0018); NCS Technologies Inc.,* Manassas, Virginia (SP4702-26-D-0019); Nikon AM Synergy Inc., Long Beach, California (SP4701-26-D-0020); Precision Additive Solutions Inc.,* Indianapolis, Indiana (SP4701-26-D-0021); Relativity Space Inc.,* Long Beach, California (SP4701-26-D-0022); Shepra Inc.,* Orange Park, Florida (SP4701-26-D-0023); Sintavia LLC,* Hollywood, Florida (SP4701-26-D-0024); Stratasys Direct Inc., Eden Prairie, Minnesota (SP4701-26-D-0025); and Velo3D Inc.,* Fremont, California (SP4701-26-D-0026), are sharing a maximum $9,800,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract under solicitation SP4701-25-R-0001 to provide a Joint Additive Manufacturing Acceptability IV pilot parts program. This was a competitive acquisition with 27 responses received. These are one-year base contracts with four one-year option periods. The performance completion date is Feb. 24, 2027. Using customers are Army, Navy, Air Force, Marine Corps, War Department, and Defense Logistics Agency. Type of appropriations is fiscal 2026 research, development, test and evaluation. The contracting activity is Defense Logistics Agency Contracting Services Office, Philadelphia, Pennsylvania. (Awarded on Feb. 25, 2026)

Contract SP4701-26-D-0001, contract; awarded 2026-02-25

General Electric AerospaceAir Force $29.1M IDIQ ceiling
General Electric Aerospace, Lynn, Massachusetts, has been awarded a $29,133,666 indefinite-delivery/indefinite-quantity contract for contractor engineering and technical…
…services. This contract provides for advisory engineering and technical services until organic engineering capability is developed. Work will be performed at Springfield, Illinois; Tucson, Arizona; Portland, Oregon; Bahrain; Israel; Korea; Egypt; Slovakia; and Bulgaria; and is expected to be complete by Dec. 31, 2028. This contract involves Foreign Military Sales to Bahrain, Israel, Korea, Egypt, Slovakia, and Bulgaria. This award is the result of a sole source acquisition. Foreign Military Sales funds in the amount of $746,100 are being obligated at time of award. The Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA860426DB001). (Awarded on Feb. 27, 2026.)

Contract FA8604-26-D-B001, contract; obligated at award $746,100; awarded 2026-02-27

General Electric AerospaceNavy $31.3M 0.02% of RPO0.07% of rev.
General Electric Aerospace, Lynn, Massachusetts, is being awarded $31,302,761 for a fixed-price, long-term contract with prospective price redetermination for repair…
…support for the T-64 engine. This is a five-year contract with a three-year base contract period and one two-year option period. All work will be performed in Cherry Point, North Carolina. Work is expected to be completed by March 2029 and if the option period is exercised by March 2031. Fiscal 2026 working capital funds in the amount of $6,853,829 will be obligated at the time of award to fund delivery order (N00383-26-F-0U10) that will be awarded concurrently with the contract and funds will not expire at the end of the current fiscal year. One source was solicited for this sole-source requirement pursuant to the authority set forth in 10 U.S. Code 3204 (a)(1) and one offer was received. Naval Supply Systems Command Weapon Systems Support, Philadelphia, Pennsylvania, is the contracting activity (N00383-26-D-U101).

Contract N00383-26-D-U101, contract; obligated at award $6.9M

General Electric Co.Navy $20.1M 0.01% of RPO0.04% of rev.
General Electric Co., Lynn, Massachusetts, is being awarded $20,085,584 for a firm-fixed-price delivery order (N00383-26-F-TF04) under a previously awarded basic…
…ordering agreement (N00383-22-G-TF01) for the repair of 16 components supporting the F404 engine, for a total of 275 repairs. The delivery order does not include an option provision. All work will be performed in Lynn, Massachusetts. Work is expected to be completed by December 2027. Fiscal 2026 working capital funds (Navy) in the amount of $20,085,584 will be obligated at the time of award and funds will not expire at the end of the current fiscal year. One source was solicited for this sole-source requirement pursuant to the authority set forth in 10 U.S. Code 3204 (a)(1) and one offer was received. Naval Supply Systems Command Weapon Systems Support, Philadelphia, Pennsylvania, is the contracting activity.

Contract N00383-26-F-TF04, order; obligated at award $20.1M

General Electric Co.Defense Logistics Agency $14.2M maximum
General Electric Co., Cincinnati, Ohio, has been awarded a maximum $14,166,872 firm-fixed-price contract for F110 main fuel controls. This was a competitive acquisition…
…with two responses received. This is a four-year contract with no option periods. The performance completion date is June 30, 2029. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Oklahoma City, Oklahoma (SPRTA1-26-F-0089).

Contract SPRTA1-26-F-0089, contract

General Electric Co.Defense Logistics Agency $43.8M maximum
General Electric Co., Lynn, Massachusetts, has been awarded a maximum $43,780,864 modification (P00038) to a five-year base contract (SPE4AX-21-D-9413) with one…
…five-year option period adding F110 front frames. This is a fixed-price with price redetermination, requirements contract. Location of performance is Ohio, with a Dec. 31, 2029, performance completion date. Using military service is Air Force. Type of appropriation is fiscal 2026 defense working capital funds. The contracting activity is Defense Logistics Agency Weapons Support, Richmond, Virginia.

Contract SPE4AX-21-D-9413, modification

General Electric AerospaceNavy $1.42B 0.81% of RPO3.67% of rev.
General Electric Aerospace, Lynn, Massachusetts, is awarded $1,421,446,110 modification (P00003) to a firm-fixed-price contract (N0001924C0019). This contract…
…definitizes Lots Nine and 10 and adds scope for Lots 11-13 for a combined quantity of 277 T408-GE-400 turboshaft engines in support of CH-53K full-rate production aircraft for the Marine Corps, as well as provides associated programmatic support. Work will be performed in Lynn, Massachusetts (labor surplus area), and is expected to be completed by September 2032. Fiscal 2026 aircraft procurement (Navy) funds in the amount of $219,605,186 and Fiscal 2025 aircraft procurement (Navy) funds in the amount of $277,805,828 will be obligated at the time of award, none of which will expire at the end of the current fiscal year. Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

Contract N00019-24-C-0019, modification; obligated at award $497.4M

Which names count as GE

Contract announcements name the legal entity that signed (often a subsidiary). These are the names matched to GE and the rules that matched them.

Rule (normalized name)Valid fromEvidenceNote
^general electric\b—company nameSame ticker before and after the April 2024 GE Vernova spin-off
^ge aerospace\b—company name
^ge aviation\b—company nameLegacy name